# Sembcorp Industries — FY 2025 Full-Year Financial Results Webcast Briefing

Event: FY 2025 Full-Year Financial Results Webcast Presentation & Analyst Q&A
Date: 20 February 2026
Issuer: Sembcorp Industries (SGX:U96)
Provenance: automated speech recognition (asr) of the issuer's public webcast recording
Source recording: https://webcast.openbriefing.com/Sembcorp_FY2025/
Official record: https://www.sembcorp.com/en/investor-relations/
Presenters: Wong Kim Yin (Group President & Chief Executive Officer), Eugene Cheng (Group Chief Financial Officer)
Words: ~17,031

Unofficial machine transcript. Prepared by SMID Research from the issuer's public webcast recording by automated speech recognition, without a full manual check: expect mis-heard names and figures. There is no speaker attribution: the source recording carries no diarisation, so cues are shown as timestamp and text only; timestamps refer to the recording. Not a company publication. Sembcorp Industries' own investor relations page (https://www.sembcorp.com/en/investor-relations/) is the authoritative record. Copyright in the briefing rests with Sembcorp Industries; contact contact@smidresearch.com for corrections or removal.

---

[00:11:48] My test one, two, three, four, five, six, seven, eight, nine, ten.

[00:11:59] Okay, testing one, two, three, four, five, six.

[00:12:58] Testing one, two, three, four, five. Testing one, two, three, four, five. Ladies and gentlemen, a very good morning to everyone joining both in-person and on the web.

[00:25:36] Welcome to SAMCOP Industries' full year 2025 results presentation. My name is Sin Jin from Group Strategic Communications and Portfolio Management. Before we begin, may I request that all mobile phones be switched off or set to the silent mode. And if you feel unwell at any point, please approach our staff for assistance. Joining us on the panel today are our group CEO, Mr. Wong Kim-in, and our group CFO, Mr. Eugene Cheng. There will be a question and answer session following the presentation. Without further delay, I will now hand over to Kim-in to begin the presentation. Kim-in, please. Thanks, Jin. Good morning. Very happy Lunar New Year to everyone. Let me now quickly get into the results of 2025. Now, before I begin, I want to also set the stage. Compared to 2024,

[00:26:37] we have had those of you who have been following us would know that we have significant hit win in 2025. The margins in Singapore has been under low pressure with the increase in the supply in the Singapore market. That's the first one. In our UK, margins and volume also come under pressure. China renewables continue to face heavy curtailment as well as pricing pressure. So despite those headwinds, we were able to offset the impact from those and came out in a resilient outcome which is, you can call it flat, but it is not without effort that we can get to the $1 billion mark. So for consecutive years we stayed at that level and that has given us the confidence to come out and say, hey look, the underlying cash flow and the business is strong and resilient and actually the cash flow is growing. And because of that, we convinced the board to allow us to increase the dividend.

[00:27:42] It's just an indication. It's not much of an increase to 25 cents. We recognise that we lack our peer group in terms of dividend pay out. But now again we are operating at this one billion dollar platform. This new normal that may not be new, it's been three years, but I think everybody is convinced that we have that underlying capability to increase our dividend, to close the gap between our sales and our peer group. So the idea is that in terms of returns, one can look forward to dividend. And then the second thing is that in terms of growth, we show you that in the year we are pending the completion of a major acquisition in Australia, opening up a new market for growth, a new platform for growth that is of scale. So returns and growth, that's the message. If I want you to take away two messages, please, those will be the two messages. So

[00:28:47] now let me go through some of the details in 2025 performance. The turnover was 5.8 billion, the EBITDA 2 billion, underlying net profit 1 billion. So, you know, easy to remember, 621. That's how I remember the minus around numbers. Underlying earnings per share, 56.4 cents, ROE 18.2%. So as I mentioned just now, we propose a final dividend of 16 cents, bringing a total of the year to 25 cents. This is compared to 2024 to 23 cents. It's a 9% increase. And again, like I say, we recognize the gap in terms of payout ratio and dividend yield from our peer group. And the idea, the intent is that over time, you know, we're very comfortable and confident that we can close that gap. Then into the business segments, under gas

[00:29:49] and related services, earnings of the group continue to be anchored by guests and related. Within the segment, the Singapore portfolio contributed $538 million in net profit or 77% of the GRS segments net profit. A combination of long-term contracted portfolio as well as the incremental contribution from Sanoko Energy provided the anchor for the earnings in 2025. During the year, in the last year, we secured 370 megawatts of long-term contracts, of which 150 megawatts was from Micron, which we announced in January this year. So we continue to execute this strategy to capture demand from data centers and high tech manufacturing customers. As of February 2026, right now, close to 80% of SAMCOP's portfolio is contracted for five

[00:30:53] years and above, while the SANOCO Energy's portfolio contracts are short term. So in 2026, just to go a bit further, 5% of the SAMCOP portfolio will have to be re-contracted, Well, about 50% of Senoko energy's portfolio must be re-contracted. So we expect that, of course, lower blended sparks spread for the new contracted volumes. So 50% of Senoko, 5% of the Senko portfolio. So this impact will be partially offset by operational and financial synergies from both portfolios. Then in the fourth quarter of this year, 2026, the commissioning of the 600-megawatt hydrogen ready power plant is expected to take place. It is highly efficient and that will enhance our fuel and cost efficiency of the entire

[00:31:56] fleet. During the year 2025, we've also secured long-term PPA for SAMCOP Salala, independent water and power plant. This 10-year contract will commence from April 2027. The previous contract, which is currently running, is of a 15-year contract and will expire in April. So we secured another 10 years and that will provide the stability coming in from the contribution of Oman. So the Middle East is entering a new phase of rising energy demand driven by industrial and digital hubs that require reliable uninterrupted power. We have extensive experience operating critical power and water infrastructure in the region, and we will selectively pursue growth opportunities in the Middle East. Moving on to renewables, during the year we maintain

[00:32:59] the pace of growth in the selected geographies, adding 3.6 gigawatts of new capacity to our portfolio, compared to the end of 2024. The earnings from the renewable segment increase 5% year on year. This is despite the contribution from China renewables declining to $74 million, from $89 million in 2024. In India, we have seen improved contribution from the existing fleets, as well as from newly commissioned megawatts. During the year, the pipeline continues to grow in renewables. We acquired 300 megawatts of solar capacity and secured 1.5 gigawatts of green fuel winds, comprising hybrid projects, round-the-clock projects, firm and dispatchable renewable energy projects.

[00:34:00] We are actively exploring capital recycling options in India. In the Middle East, we successfully entered the wind market in Oman with 125 megawatts green fuel development project underpinned by a 20-year PPA. In Singapore, we were awarded solar projects totaling 236 megawatt peak, including two floating solar projects reinforcing our position as the country's leading floating solar energy player. In Southeast Asia, we completed the acquisition of 49 megawatts hydro project in Vietnam and a 280 megawatt solar and energy storage portfolio in Indonesia, which is currently under construction. So our total group renewable capacity is now 20.4 gigawatts, of which 5.4 gigawatts are secured, either under construction or under advanced development.

[00:35:01] This 5.4 gigawatts of new capacity will progressively come online between 2006 and 2030. Integrated urban solutions, the net profit for the IUS segment was stable. Earnings from our water segment was stable while contribution from the other divisions were lower due to the absence of contribution from same waste or same environment. Obviously we closed the deal to divest same waste in February, March 2025 so it's been some time. So compared to 2020, the contribution from same waste is of course no longer. The urban business continues to secure new industrial projects, bringing our total gross development land area to over 16,000 hectares. In Vietnam, we secured four new investment licenses, and this brings the total number

[00:36:06] of projects in Vietnam to 22. In Indonesia, we are developing the 500-hectare candle industrial park phase two. that phase one is almost mature and most of the land has been sold. So now we're moving on to phase two with 500 hectare. And we are also progressing on the development of the 100 hectare 10BC innovation district in Bataan. We have also doubled our leasable gross floor area to 1.1 million square metres from half a million square metres in 2024. So this occupancy rate of our operational industrial properties increased to 96% from 76% as of the end of 2024. So in terms of both growth in square metres and also in terms of occupancy rate, the IUS

[00:37:09] team has done well to improve the performance. So this will particularly this area will further strengthen our recurring income coming up from IUS. So we will continue to review and sharpen our portfolio as we did through the sale of same waste and the divestment of municipal water business in China during the year. The long term fundamentals of SAMCOC is very strong. We are in the right places. We have got secured cash flow through contracts with high quality customers. And later, Eugene will show you the underlying cash flow coming from the Singapore portfolio. And then post completion, the Alinta portfolio is actually very, very robust. But in the near term, we are facing some headwinds, which shouldn't be new.

[00:38:14] These are the things that we experienced in 2024, but in 2025, or rather in 2025 and in 2026, we want to flag that in front of you and give you a little bit more color what we will do about them. In Singapore, with a new supply coming on stream, we can naturally expect the worst bug spreads. And since 2023, you know that we have been transforming our portfolio by leveraging our position as an integrated gas and power player, as well as the largest renewable player in Singapore to secure long-term contracts. So what was previously a very merchant heavy portfolio is now a largely contracted one. Of course, I'm speaking about the same portfolio, not the Senoko energy portfolio. Now, Senoko energy, we will go in there and try to add value as we did with our own portfolio. But the good thing is that we got it at a price, at an investment level, that is very

[00:39:17] comfortable notwithstanding the mature nature of the business. But as a portfolio, there are significant synergies in terms of financing, in terms of operations, in terms of how we run the plan. For instance, we can sign a hedging contract with a no-go to provide insurance so that then we can aggressively contract our base load high efficiency units in the SAMCOC portfolio. So there are significant synergies. We bought Senoko at a very attractive valuation. And in combination, we are now the largest fleet of gas fired power stations in Singapore together with our integrated gas portfolio and as well as our position as the largest renewable player. We are very well positioned. We think that we are highly competitive and the diversified portfolio will position us to capture the growing AI demand in Singapore,

[00:40:25] particularly from data centers and high tech manufacturing sectors. Let's go off script a little bit. When we say today, there's a lot of hype about AI, you know, shares, share price of some of these companies, tech companies are very high. We're not in that game. But by the time the AI demand translates into energy demand and it translates into a contract with Samcock, that is a solid demand. Because that demand for energy is coming from micron, is coming from data centers that are hyperscalers with good credit profile, right? So we are sort of on the receiving end of it. I'm not saying that we are AI company now, but by the time we receive the demand translated from all the noise in the market, it is actually a very, very solid demand that we are capturing, right? So the important thing is that we are ready to capture it.

[00:41:27] And what we are saying here is that we are very well positioned to capture that demand. If I move on to China, of course we will continue to face curtailment and tariff pressures alongside with the recent cancellation of value-added tax refunds for onshore wind projects. So these are developments that will affect the entire sector, not just us. Now, we will remain very disciplined in managing our portfolio exposure in China in terms of Thinking through project additions or even divestments, we will allow time for expansion of transmission network and also pursue contracts to try to stabilize earnings. Having said all that, to put things into perspective by now, if you look through the numbers, China is a relatively small contributor to the entire picture. And as I mentioned just now, notwithstanding the headwinds and the lower contribution and the reducing contribution in the last couple of years,

[00:42:29] we were able to plug the gap through other means. The last one is the UK. The closure of our key customers' operations, particularly SEPIC, has driven largely by weak economics, of course, in the industrial sector, as well as in the UK in general. We are driving active cost management and repositioning the business to capture data center opportunities. We'll talk a little bit more about why we think we can capture that in the next slide. So I mentioned just now that we believe we are well positioned to support the region's accelerating AI driven energy demand. So allow me to take a little bit of time to elaborate our guest and related services provides reliable base load energy. We are well positioned to capture more demand from new data centers as well as the semiconductor sector. As we have shown you, we now supply almost 700 megawatts of the high tech manufacturing sector which includes also the recent 150 megawatt contract with Micron.

[00:43:36] Our renewable business delivers tailored green PPA solutions and long-term renewable energy supply for high demand industries to meet their clean energy targets. Contracts secured include the supply of power-backed renewable energy certificates to day one 20 megawatt data centers under 10-year PPA. So data center day one, 20 megawatts to a 10-year contract, that sets the tone of what we can expect moving forward as more new data centers get planted in the region, particularly in Singapore. We've also signed a 25-year renewable energy purchase agreement with META platforms, and this is to build, own and operate 150 megawatt floating solar farm in Kranji. And finally, under the IUS business,

[00:44:37] we provide low carbon infrastructure to customers. And we are able to develop sustainable data center infrastructure with partners to supply land and power along with other green services. So within the Tambisi Innovation District in Batam, Indonesia, we can accommodate up to 100 megawatts of data center capacity. For those of you who are familiar, Bhatam, of course, is reducing the connection of fiber coming in from companies such as Singtel. So it is not whether there will be data centers. It is when and of what size. And what we have there in 10 BC is a ready 100 hectares of land ready to connect up to all these data center demand. And in the UK, Wilton offers 138 hectares of ready land with immediate grid connection and supporting infrastructure.

[00:45:41] And that is naturally attractive for potential data center developments. Because as you know, for data centers, one of the biggest constraints is the power supply. And if you're in a place like UK or for the matters in Singapore, Australia, places like this, to bring a new substation and a high voltage cable to supply a newly increased demand from data center that will take time. So existing infrastructure, existing land will provide that opportunity. So together in GRS, in renewables, as well as in IUS, SAMCOP is actually a very attractive comprehensive energy and infrastructure partner for the AI players. By integrating reliable baseload scalable renewables and sustainable urban solutions, we want to capture the region's growth while enabling our customers to accelerate their decarbonization and digital transformation ambitions.

[00:46:45] I shall not go through this and in the script that Jin has given me, I think what I want to emphasize before I hand over to Eugene for the detailed numbers is again, first in terms of returns, we are expecting that we will be able to improve our dividend payout ratio and dividend yield steadily over the coming years. And this year, the two cents increase compared to 2024 is just an indication and we have deliberately been quite prudent given that we are pending the closing of a major transaction in Australia. So to close the gap in terms of dividend, you and payout ratio compared to our peer group. So that is the first thing. And the underlying cash flow, I have explained where our balance sheet and cash flow positions when we discuss the Alinta acquisitions a month ago. But if we need to provide elaboration, again, I'm happy to do that later.

[00:47:52] But suffice to say, we're very comfortable with our balance sheet position. We have very strong cash flows coming in. In fact, you know, we struggle to find the type of growth opportunities like Alinta where we can deploy the cash flow. So naturally either you grow or you reward shareholders and return it to them in the form of dividends. So that's the first thing. And the second thing is that in terms of growth, we have immediately in front of us Alinta, which we will hopefully complete sooner than later, but certainly we expect within this year if not the first half. And Alinta will provide at least for the next few years a significant scale market and a significant growth capabilities. We have a very strong management team now under to help us grow the entire energy portfolio. The list of it is a 10 gigawatt renewable pipeline that they have already identified,

[00:48:53] in addition to a very energy-staffed, high-demand growth Australia energy market. So certainly in the next few years, in terms of returns and in terms of growth, we are quite set up for that. So that's the picture that I want to leave with you before I hand over to Eugene. So Eugene, please. So I'm glad to, as Kim Min has pointed out earlier on, I think 2025 was a year, the half year earnings announcement that we are seeing some hit wins, but we were quite pleased that as we close 2025, we were still able to close the year strong, right? Keeping to the billion underlying net profit earnings relative to 2024. Now, on this slide is basically the group level statistics, and I will talk through them. I will use one particular slide which

[00:49:54] talks about the net profit of the different segments to elaborate more in terms of the specific performance. Now, if we look a headline from a turn event, if it does standpoint, we did see a commensurate 10% decline across both of them. I think from a, you know, we already know the key reasons for that. In general, in Singapore, we did see, you know, in general, lower stock spreads for the renewed contracts that took place towards the latter part of Q2 that also carried through for the rest of the year. And also, in addition to that, we also saw, you know, a high cost power import contract that continue to a way down. And also we did see some compression of gas margins and also the absence of a roughly 10 to 15 million of a gas upstream curtailment again that we had in 2024 that was not present

[00:50:56] in 2025. In addition to that, we also saw a weaker price and customer demand across the UK, in the UK a Wilton gas business. For 2025, we were a hedge on contracted forward prices at the end of 2024, which was a weaker relative to what was hedged for 2024 at the end of 2023. In addition, we also saw the petrochemical sector, which is a significant part of the current customer base in Wilton, that has seen weakening. So, in general, customer demand has been weak as well. So, we did see a weaker demand from the UK. Now, of course, we also were impacted by the loss of contribution from assemblies after we have divested that in March of 2025. Now this is partially offset by new capacity

[00:51:58] that has been commissioned in renewables right across India, the Middle East, as well as Southeast Asia where we completed the acquisition of the 49 megawatts of a hydro project in Vietnam. Of course that is offset by some curtailment issues that take place that continue, particularly in the Guangxi province of our control portfolio. So the effect across the turnover in Ibeda. Now share of results of associates and JV increased a monthly by 57% or 180 million. Of course this is driven by Senokos a full year contribution of 30% and an incremental 20% for half year. Now from a Senokos standpoint, This contribution is also offset by a renewables of roughly 15 to 20% of its contracted portfolio

[00:52:59] in the latter half of a 20 or 25. Now, just to give you a sense, in those rounds of contracting, we essentially saw the re-contracted spark spreads come off quite market. We were contracting between 30 to $35 spark spread for that renewal. and which essentially came off highs of $70 to $80, which were contracted more at the year 23 period for them. Now, of course, I will touch on later on because there continues to be a re-contracting taking place as Kim Min highlighted to 2026. We also saw in the visit portfolio, we saw a higher contribution, right? Part of it is as a result of a fair value gains for the completed RBF projects within the visit parks that we own. But this is offset by some land sales witness in central Vietnam.

[00:54:04] The fair value contribution was $27 million, but I'll talk about it later on later. And it's also offset by continued China curtailment in the SDIC portfolio. All in all, adjusted EBITDA, it's about 2% lower compared to FI2024, 2016 compared to 2050. And our net profit before exceptional items and the DPNFX is a 1003 relative to a 1014. Now we did realize a non-cash FX loss for the deferred payment note in 2025 of $154 million. This is roughly about coming simply from a roughly 10 to 11% depreciation of the Indian rupees relative to strengthening Singh dollars. When we compare the rate in which we mark the market or rather translate the DPN balance

[00:55:05] from Indian rupee to a Singh dollars, the rate used in the as of the December of 2024 was compared to the rate used at the 31st December of 2025, the rate declined roughly 10 to 11%. Of course, this does not indicate any cash flow impact, but it's really a mark the market. Now, as highlighted previously, hedging the balance of the deferred payment note, it's dependent on two factors. Number one, the visibility of fixed cash flows. Now, the deferred payment note is largely on a availability of cash sweep model, right? And as a result, putting in place hard forward cash flow hedges effectively from accounting standpoint will not result in a effective hedge, right? I think the second element also throughout 2025, when we look at what is the forward cost of hedging,

[00:56:06] the forward cash flow cost of hedging is, well, will result in a worse outcome than the idea mark the market. And if we do put on those hedges, it will be real cash outflows. So as a result of that, we did not put in any form of forward contracts as a counterbalance against the rupee swings here. Nevertheless, $154 million is really a one-time mark market does not indicate any cash flow impact in the current cash flow generation capabilities of the portfolio. We have an exceptional items gain of $135 million. So that comes largely from the sale of a Sam waste. Also included in the sale of Sam waste, in this, sorry, exceptional items was the positive goodwill or bargain purchase option gain as a result of the second tranche completion of the Sanoko transaction.

[00:57:07] This is offset by roughly $28 million, $28 million to $13 million of some asset impairments that we took across Southeast Asia, where we made the broader decision that we will not continue with the rooftop solar business, which generally is a very small part of Southeast Asia currently. Now, so all that results in a net profit from continuing operations. sticking into account the DPN FX loss and the exceptional items of 984, right? Law of which driven by the DPN FX impact. Now our ROE from a more underlying basis, right, before exceptional items and our DPN FX loss is 18.2% relative to 20% last year. Now there are some capital drawdowns that took place in 2025, particularly in relation to CCPFOC, and also continued capital deployment for our pipeline,

[00:58:08] and also certain projects that came online, but we're not contributing on a full year. I will illustrate what the effects are those from a normalized basis on a slight later. I won't touch so much on the broad group turnover, because the reasons are largely about what I've highlighted earlier, but I wanna move on to the next slide, which illustrates the group net profit by segment. Now for the gas and related services, we turn in 701, which is a 4% decline relative to 728 in FY2024. As Akimin has shared in the earlier slide, the effects can be broken largely into two. So for the Singapore gas and related services portfolio, portfolio, FY2025 turned in $538 million relative to $546 million in FY2024. These numbers are there, it is just in Kim Min's earlier slides. So that is approximately an $8 million decline.

[00:59:14] There are basically two effects here. One contribution from Sanoko and the other one, which is the continued margin pressures that we see in our Singapore only a portfolio. I think throughout 2025, as highlighted in the first half results, we did see roughly a 10% of our portfolio re-contracting 90 to 100 megawatts from the SAMCOC portfolio that took place at that point in time. We did see spark spreads coming off down to the $30 range, which was coming down from a high of the $80 to $100 range that was previously contracted. that carried through the full year and the impact from the declining aspect was about 60 to 70 million dollars on a full year basis. Now we also saw the high-cost power import contract that we signed and

[01:00:15] this goes at the end of December 2024. The run rate impact in the first half carried through for the full year as well. So in the first half we highlighted it was about 20 million or so. So that continued to a way down the portfolio. We also saw some declining gas margins. And also, in addition to that, there was a one off-containment compensation gain in 2024, about 15 to 20 million. That wasn't there in 2025. So these are the impacts on the ex-Cernoco portfolio. I think from the Cernoco compensation, largely across the gas and related services, adjusted EBITDA disclosure, you will be able to largely look at that number. But again, as highlighted earlier on, we do have to bear in mind that in Sanokos 2025 numbers, particularly in the second half, it has been impacted by roughly 20% of the portfolio

[01:01:17] that has been re-contracted. Now they have been re-contracted at 30 to 35 dollar spark spreads as well, right? And that has come off similar high levels of about $70 to $80 as Mark spread that was contracted before. And as Kim Min has highlighted in the pie chart earlier on, we expect to see close to 50%, roughly 47% of the CERNOCO portfolio that will be a re-contracting from the second half onwards. So all in all, we believe based on our visibility right now, those re-contracting levels will largely be at the $30 to $35 level as well, coming off similar highs as highlighted. So that's the visibility that we have on the Senoko earnings. Now on the rest of the world earnings, we're $1,363 million relative to $182 million for the gas and related services segment. So that's about $20 million, $90 to $20 million

[01:02:21] Now, the rest of the world gas earnings were historically largely very stable, but I think this year we saw 20 million decline largely as a result of UK. As highlighted earlier on, UK did see two effects that came through. Number one, basically lower power prices, and secondly, lower customer demand as well, the petrochemical customers in the UK, one of them, a Cebec, did not return, right, you know, for its olefins plant and we do expect the wheat customer demand potentially to carry through into 2026. So that's for the gas and related services segment. Now for the renewable segment, from a net profit standpoint, right, we turn in 192 million, which is 5% higher than 183, which we close FY 2024 with.

[01:03:21] Now, again, you know, earlier on, we have broken out this segment into China, as well as others. Let's talk a little bit about China. So for China itself in FY 2025, we turned in a 74 million net profit versus 89 million in 2024. So it's a 15 million decline. So there are two key effects to that change in net income. So firstly, it is continued curtailment that affect the China portfolio, particularly in the northwestern side of the portfolio. I mean, to give you a sense on the average China curtailment that we have across our portfolio, in FY2025, our average curtailment for the win portion of the China portfolio was 14% versus 8% in 2024. So it's a very significant increase in curtailment. And for the solar portfolio, it was 16% average of curtailment in 2025,

[01:04:23] relative to 9% in 2024. So, also, you know, commensurate increase in the level of curtailment. So the impact of curtailment on the China portfolio in FY2025 was approximately 30 million in net income, okay? But we did see a capacity increase in 2025 from project pipelines that were coming through. Gross capacity, we added about 900 megawatts. So the increase, the capacity increase, plus also some stronger generation that we see in our high portfolio on the wind generation, did result in a $15 million positive net income on a year-on-year basis. So the net effect of both, like curtailment, negative 30, but we didn't have some, you know, a capacity, 900 megawatts of capacity increase and stronger wind generation in the

[01:05:24] high wind portfolio that resulted in a net $15 million downside in our China renewables earnings. Now, in the other portfolio, which comprises of India, Middle East, as well as Southeast Asia, we saw in 2025, we did 118 million relative to 94 million in FY24. That's a 24 million increase. This is largely driven by two things, right? We did see, you know, a new capacity commissioning across India, Middle East, and also we completed a couple of acquisitions, right? one which is the 300 megawatt renewal portfolio, and also the 49 megawatts Vietnam Hydro portfolio, though those were later in the year and did not contribute on a full year basis. So all in all, that contributed to that increase. I think in addition also we did see a slightly better win resource of performance across India as well.

[01:06:24] So that contributed to the renewables portfolio outside of China that saw a 24 million increase. So if we move to the integrated urban solutions, it is flattish across both from 2025 compared to 2024, 178 million compared to 173 million. But when we break across the three segments in Kim Min's earlier slide, the urban business, 1314 million relative to 101 million in 2026. So it's about a 13 million increase. So the increase was really driven by about 27 million of a fair value gains as a result of the ready-built factories and warehouses that are being commissioned. But this is offset by some land sale weakness in central Vietnam. And as you will recall, one of the areas that we have been very vigilant since the liberation date

[01:07:28] Paris were announced was a central Vietnam, where the manufacturing activities of our customers tend to be of lower value at a variety. And we all know that central Vietnam, in Vietnam itself, basically, from a labor perspective, they are of a lower level. So we did see a weakness in that segment as well. But across the northern, as well as the southern part Vietnam, we continue to see land sales to be strong, and also across Indonesia. I think Kim Min brought up an important point. The coming through of the ready-built factories and ready-built warehouses did also increase our recurring income contribution in urban business. Now, in 2025, our recurring income contribution across infrastructure charges in the parks, as well as the radio build factories is approximately 20%.

[01:08:30] Net profit contribution from recurring income. This has increased marketly compared to about 10 to 12% three to four years ago. So the coming through of the radio build factories has improved the recurring income quality within the urban portfolio. As highlighted also by Kimin, going into 26 and 27, going into 28, we would have significant amounts of ready-built factory and ready-built warehouses to be constructed. And once that is done, we would see even stronger recurring income contribution to urban. In the water business, we're turning 52 million relative to 50 million in 26, so fairly stable. We did see cost optimization efforts in 2025 efforts in 2025 that turned into fruition, approximately 2 million cost optimization gains that hopefully the state has run

[01:09:31] rate going forward. But one point to note also in 2025, we did receive a one off of 10 million receivable settlement for a past receivable in relation to one of our not so well performing municipal asset, Xinzhou. In 2024, we also have similar levels of one off gains, but that was across Fucho and another water plant compensation collection, recoveries of past receivables, as well as certain provision reversals. The last element to talk about in IUS is really our waste and our waste energy business. We did see a decline of 10 million, and this is largely contributed from the divestment of the same waste business, which took place in March of 2025. Now, if we move on further down the line into the decarbonization solutions segment, so while we turn in a negative 23 relative to negative 20

[01:10:34] in FY 2024, one of the key elements of that 3 million increase in terms of our losses is a result of a write-down of our REX inventory value in a GoNet zero. I think in 2025 we have seen a marked decline in the value of the REX. So we took off a meaningful write-off and that contributed to the increase in the losses. Now in other businesses, you know, we are turning 45 million relative to 38 million in FY 2024. Now other businesses, you know, it largely comprises our Samkop specialized construction as well as the mint business. The main business continues to contribute to 1 to 2 million of net profit, so it remains flat. But our Samkop construction business continues to accelerate in net income realization simply because of a growing order book. Order book for the Samkop construction business

[01:11:39] in excess of 1 billion currently. So going further down the line from a corporate cost perspective. Now for interest cost we were able to optimize that by about 10 million largely and this is a corporate level of interest cost. Now we were able to do that because you know we did take efforts to you know you know optimize you know our cash usage to minimize negative carry. I think in addition to that also we benefited from refinancing activities that you know were at a lower interest cost. We were also quite active in looking to rework some of our commitment fees for example with our banking partners and this resulted in a reduction in our interest cost. Now our other corporate cost reduced by 25 million. So to give greater clarity of that, 11 million of that on a year-on-year basis came as a result of past tax provision

[01:12:45] reversals. That is in relation to a refolding tax provision that we made against a China dividend that was paid up. So the refolding tax provisions has gone past time bar, the time bar, and hence it was okay for us to release the provisions. But 14 million after the 25 billion came through discretionary cost savings. So we were managing costs across professional fees, across travel, across manpower costs throughout the year. And that allowed us to realize the cost. Now going forward, because these are cost management efforts against discretionary costs, we will continue those efforts in 2026, but we may not be able to realise the same magnitude of cost savings, but we will continue to be driving cost savings at the corporate level in those areas. Now, for the DPN income, that has come off $25 million, $159 down to $119 million.

[01:13:52] Now, I think that simply is a result of continued pay down of the debt balance in India, of the deferred payment note. I think one of the key things to highlight is, you know, the cash flows as well as the earnings performance of the underlying asset, which is SEIL, the cold blood continues to be very strong, right? People, I may not have highlighted this enough, but from since the transaction in September, in January 2023, right, until today, total cash collected across both income as well as principal pay down in same dollar terms is in excess of a billion, right? It's about 1.05 billion, right? So, you know, looking into 2026, we do expect a continue a similar strong, you know, cash flows return and pay down of the deferred payment note

[01:14:55] income as a result of SEIL's underlying performance. But of course, that will also mean that our DPN income will continue to decline as we see a faster recovery of the principal. So I think essentially that largely highlights the differential performance across all the segments. And the DPNFX gain loss and exceptional items I've touched on early on. so I won't go into more detail. If move on to the next slide, this is basically a bridge that highlights what I was talking about, so I won't talk through this slide again. Now, in terms of the group ROE, as highlighted earlier on, we did see a decline in the group ROE. Gas and related services was 32.1 in FY 2024, now to 26.4. Now, in the ROEs itself, there are two effects. I think the firstly, it is the declining spreads, as we are talking about. But the second element also is we are incurring K-PACs

[01:15:59] and drawing on capital, particularly for CCP4. So in 2025 was the year where we incurred the larger amount of K-PACs coming into 2026, where we expect a CCP4 commissioning to take place towards the end of the year. So normalizing for that, the ROEs would have been better. Now for renewables, it's 7.4 relative to 8%. Two effects, one of the elements is we continue to see curtailment elements way down the China portfolio. Also, we have projects that are commissioned that have not contributed in a full year. I will show the normalization of the effects in the next slide. And the integrated urban solutions continue to be at 8.4%. Now, if we move to the next slide, Now, if we look at the ROEs as highlighted, we do want to call out what are the capital draw

[01:16:59] that has potentially weighed down the ROE versus what has been on a normalized basis across the renewables as well as the group. For renewables, we did have a 0.7% that comes from a combination of projects that were commissioned in 2025 that did not contribute on a full year basis, right? So if those projects contributed on a full year basis, you know, have been an additional 0.7%. Now we also have, you know, certain projects in the pipeline that are under development and have drawn down on, you know, K-PACs, right? And have not have not seen it yet. So the impact of that is about, is another 0.2% on ROE. So the normalized renewables ROE will have been about 8.3%. From a group perspective, on a similar basis, The contribution from projects that were commissioned in 2025, if they contributed on a full year basis, that would have been a 0.3% impact. And projects that are under development

[01:18:00] would have been a 1.8%. Now that looks a lot larger relative to renewables because the biggest part of that is the key facts that is drawn for the CCP for construction, which is expected to be commissioned in the later part of the year. So if you move on to the next slide, this is to highlight the impact, the translation impact of the strong SING dollar across the different currencies had on our earnings. As you will recall, I highlighted this in the first half because from the first half we have seen a almost systemic strengthening of the SING dollar against all our key functional currency exposure. Now just for us to note this translation impact is simply for each of our overseas operations, The accounts are kept in local functional currencies. And when we translate back into Sink dollars, we would have to use an average translation rate. And that translation rate have a decline.

[01:19:01] Operationally, in the respective markets, certainly it is not an indication of the operational earning capabilities in those markets. So, cumulatively across 2025 compared to 2024, the estimated impact on the translation impact on earnings has been about 32 million. So it's fairly significant, almost 3 to 3.2% of underlying earnings. So this continued heightened our currency quality. We will monitor the situation, but given that this is a translation impact, traditional hedging activities may not be that effective.

[01:19:51] Now, if we move on to the next slide, this is really our Capex and equity investments for FI 2025. In short, total investments that we have made in 25, total about 1.2 billion, right? Relative to close to 2 billion in 2024. And if we move to the next slide, Our cash flow generation continues to be strong. In 2025, our operational cash flows is about $1.2 billion, slightly down from $1.4 billion the year before. Now taking into account cash flows from essentially interest income as well as dividends and the DPN receipts, And our free cash flow before deployment for expansion, K-BACs, as well as equity investments, it's about 2.1 billion relative to 1.8 billion last year.

[01:20:52] Now of course in the 2.1 billion, we have the benefit of 383 million, which is the net cash proceeds realized from the assembly sale. But even if you take that out from the free cash flow of 2.1 billion, our free cash flow available for debt service as well as growth on an annual basis still remains approximately 1.7 billion, which is similar to FR24 the year before. So highlighting our confidence that we can service any outlook in relation to our dividends going forward. So in terms of our group borrowings, from a gross debt perspective, we saw roughly about 200 plus, 300 million increase that result as a continued drawdown of the completion of our pipeline and also CSP form. But also because of our overall net,

[01:21:53] stronger net cash flow generation, our net debt remains fairly similar to last year at roughly 7.8 billion, with our cash and cash equivalents increasing from $871 million to a $1.1 billion. Our key leverage metric, which we always focus on, our net debt to adjusted EBITDA stands at a 3.9 times, which is not very different from where we were one year ago. Moving on to the next slide, from a group debt profile perspective, we improved it slightly this year in some of our refinancing activities, where we were able to abandon from lower base rates, tighter margins, and also an extension in terms of tenor, we were able to refinance some of our, for example, five to seven year bank revolving credit facilities towards the eight year mark. And also we were able to issue a 20 and a half year bond at 3.55% in October of last year.

[01:22:54] So all this resulted in our weighted average cost of debt declining slightly from 4.6% in 2024 to 4.5% 4.5% in 2025 while being able to extend our weighted average debt maturity to 5.2 years. In terms of our fixed versus floating profile, 76% of our portfolio remains fixed, which means that on the floating perspective, every 1% change in the base rate will be about $15 to $16 million in back. Of course, we are mindful that given the current interest rate environment, it's on average more towards a downward bias. So we will also be monitoring our fixed and floating rate mix, taking that into account as we go through the year. So from our available liquidity, we remain strong, right? The key thing that we always focus on is what is our on-demand liquidity.

[01:23:58] So which is really a combination of our cash and cash equivalents and our unutilized committed facilities. So as of today, our cash and cash equivalents stands at 1.1 billion and our unutilized committed facilities is at 2.5 billion. So total about 3.6 billion of on-demand liquidity that will allow us to take advantage of any growth opportunities that come through. So the next slide is just to highlight the outlook. Essentially, we have delivered resilient financial results, reflecting the strength of our diversified portfolio and cost management. Now, we do have long-term contracts across our portfolio, and increasing the proposed dividend in 2025 reflects our belief in the strength of our underlying earnings and also cash flow visibility. When we go through the different segments, I think in 2026, as highlighted before,

[01:24:59] the gas and related services segment were still expected to be affected by a gliding down of our spark spreads and margins because we do, as guided before, roughly three to five percent of our own portfolio would be subjected to a summary contracting in 2026 and approximately 47% or 50%, approximately half of our of Sanoko's portfolio will be re-contracted. So coming into 2026, you will, especially for Sanoko, you would expect to see a full year impact of the re-contracting that took place in the second half of 2026, roughly 20% of portfolio, and 50% of Sanoko energy's portfolio that will be re-contracted, starting from the middle of the year onwards. So that is something to take note. Now, of course, we will expect that effect to be partially offset by operational and financial synergies across the two portfolios,

[01:26:02] and also the, where the H class is, you know, a commission. We do expect to see a greater fuel and operational cost efficiency as a result of running that hard against the portfolio first. And this highly competitive portfolio will position us well to continue to capture incremental contracts because of the growing power demand driven by data centers and high-tech manufacturing sectors, as we have demonstrated since 2023, having a leading track record in being able to do that consistently again and again. For our renewables portfolio, we do expect our platforms across India and East. Please come back from the booth. Wow, OK. I didn't know. I hope I didn't say something that was dead of shackling. But what I meant to say was that in renewables, our expanding platforms across India, Middle East and Singapore will continue to grow.

[01:27:05] That's a good thing. And with the new capacity progressively coming in 2026 across to 2030. Now having said that, for China, we continue to be very watchful. We do expect curtailment to evolve.

[01:27:22] to persist, right? And there's one other regular tree development that we will wanna highlight. Now China has come up with a policy where they said that value added tax refunds for onshore power wind projects, they're gonna stop it, right? So that applies retroactively as well to projects that have already been commissioned. So that policy change will see a $12 million impact, further impact on the China portfolio in 2026. Now for the IUS business, you know, the urban business, I think one point to highlight is that we are going into a phase in 2026 and in going into 2027, right? Where we will be developing close to 800,000 square meters of ready-built factories. So of course, you know, these ready-built factories across 26 and 27, they are not, will not be generating incremental recurring income,

[01:28:25] but you know, we would expect to see some pre-operating as well as a financing cost for them, and but once they are TOP towards the end of 2027, and going into 2028, there will be a meaningful increase in contribution of recurring income to the urban portfolio. So all of this put us in a good state to navigate our near term headwinds, And we expect the Alinta acquisition to be completed in the first half of 2026. And that acquisition, completion of the acquisition will further strengthen our earnings base, our recurring cash flow, and our ability to sustain and potentially grow our dividends over time. Okay? So a couple more developments to know. When we complete Alinta, we have already highlighted this in the circular to shareholders, as well as in our briefings, right? We do expect a one-off transaction cost of close to Australian dollars, $208 million.

[01:29:29] This will be called out in exceptional items, right? The bulk of that, more than 50% of that $208 million are really in relation to a STEM duties for the ownership transfer, okay? And in UK, we have a forward maintenance at Wilton 10, right, towards the middle of 2026. It will not be a very material earnings impact, five to 10 million dollars. So that ends my presentation and we can open up for Q&A. Thank you, Kimin and Eugene. We'll now proceed to the Q&A session. For those in the room, you can raise your hand and the microphone will be handed to you. Please state your name and the organization that you represent. Just for those online as well, you can enter your questions in the Q&A box by clicking on the raise hand icon on the webcast page, and we will address them during the session. We'll start with those on the floor, maybe Chihui first.

[01:30:35] Hi, it's Chihui from Macquarie. Thank you for your presentation. I have, well, let's start with two questions first. First, China renewables, right? It's been three years, and the curtailment issue has not improved. I think about a year ago you said that under curtailment issue maybe hit about You know 1% of your earnings, but it seems like if I didn't hear correct It will hurt correctly about 30 million Delta in a second for this year. So it's coming up to almost 3% so How are you thinking about the entire business if things do not in? Continue to deteriorate right and what a sort of of your thinking around how to mitigate this risk further. Then from your point of view, where do you see us sitting in this entire down cycle

[01:31:37] for China renewables? Are we at the bottom or near the bottom? And can we, roughly just your sense, when do you see things will improve? Then the second question is on the gas and related service for Singapore. You mentioned a decline in your gas margin. Can you run us through a bit more color on what changed, because this is a pretty significant contributor to your bottom line profit. How big was the year-to-year decline in the gas-training business? And how do you see the margins change going forward? Because if I remember correctly, this used to be a high single-digit business, you across margin business and then you moved it into a mid teens and where do you see it go now? Thank you. Can I ask Alex to deal with the China question?

[01:32:38] renewable is CEO president is here. Hey thanks, Zouwei for a question. I cannot say for sure whether China has reached the bottom in terms of the curtailment but let me offer some insights directionally where the government is going. So what's really caused the curtailment as we all know is the search in renewable in stock capacity, right, a lot of new projects. So just to give people some perspective, when we first started the journey in 2021, the renewable solar and wind, onshore wind, was growing roughly about 120 gigawatts a year. 2021, 2022, but roughly about 120 gigawatts. And what happened was in 2023, we saw a search in the renewable capacity to roughly about 300. And just to give you some perspective, 300 gigawatts a year, 2023, 2024, right? And in

[01:33:44] 2025, because of a change in policy, everybody was rushing to get their projects online by the middle of 2025 to make sure that they enjoy the existing policies. And because of that, there was a mad rush and the capacity actually surged and increased to roughly about 400 gigawatts a year, just to give you some perspective. So what's going to happen is this. I think we have to look at this from three perspectives. One is demand, second, supply, and then what is the government doing in terms of making the grid more resilient so that the grid is able to absorb all the additional capacity. So in terms of demand, as we all know, China continues to have seen a very strong power demand, roughly about 5% to 6% a year, driven by electrification, EVs, and AI.

[01:34:44] So that's one. Demand continues to be very strong. On the supply side, there is a new government policy that states the 20 by 2035 renewables is going to get to 3,600 GW, which basically translates into every year from now until 2035, renewables will slow down to roughly about 180 GW a year, which I think will give the industry a bit of relief from the 300 to 400 gigawatts a year of growth today to roughly about 180 gigawatts. So 180 gigawatts is still a big number, but if you look at it, China has a big base right now. So I think 180 gigawatts is not a bad number in terms of where the government is taking this directionally. Then the third is what is the government doing in terms of making the grid infrastructure more resilient,

[01:35:47] which is essentially one of the issues, to move the electrons from the west to the east. And the government is going to pour in 4 trillion RMB, which is roughly about 700 billion Singapore dollars over the next five years. So that's a lot of money, right, to grow the, and that investment would include things like transmission lines, which is important because they've got to move the electrons from the west to the east, which is essentially one of the biggest problems that China is facing today. The second thing is they will also put money in transformers and all kinds of nuts and bolts to make the grid infrastructure more resilient. And the last but not least is there is also another new, we are catching up, right? And there's also another new policy in November, 2025

[01:36:48] that encourages data centers to be built in the Northwest. So I think that's also important because the additional power demand in the West is going to absorb the additional power supply. And so again, just to get everybody on the same page, demand is gonna continue to be strong, 5 to 6% driven by electrification and AI. Supply will slow down based on new policy to roughly about 180 gigawatts a year until 2035. And then the third is the government is gonna power in roughly about 700 billion Singapore dollars on the grid infrastructure. And the last one is the latest news in November, which is encouragement of data centers to be built in the west. So to first put it into perspective, of course, the 30 million, a good part of it,

[01:37:52] Eugene was just telling me between a quarter to a third, it's actually new, it's coming from Guangxi. And that one is because they've got a lot hydro, heavy rainfall. So that might not repeat. Then the rest of it is coming from the northwest largely. So the northwest, that's the part that subject to the transmission, subject to the new demand coming, anybody's guess. So if you ask me whether it has hit the bottom, maybe, how much longer it will last. For our planning purposes, we are saying that for 2026, we are not counting on it to flip around. So hopefully for the near term, that puts additional color to it. Now, it takes another step back for us. It has gotten to this point where it is, you know, earlier China was supposed to be contributing 120, 130, you know, just from the renewables now, it's at 80.

[01:38:58] It could get worse. It's always possible. But it is quite beaten down already. So for us, we are planning, we are not counting on it recovering in the coming year. So we have to see. Then in the meantime, your other part of the question, what are we doing? Of course, cut costs. We are looking at other forms of managing exposure. For instance, growth has also been very, very calibrated, disciplined, selective. Those are the words. You don't see the type of growth anymore coming. We are also thinking about whether or not we could manage exposure through perhaps bringing in partners, looking at the capital structure, that type of thing. But I'm not promising anything. With the outlook, as I described just now, we're not expecting anything to change for at least another 12, 18, 24 months then.

[01:39:58] You should be doing things in the meantime. So that's what I want to suggest to you without having anything concrete to show you yet. But the plowing with that type of outlook, naturally, the management action must come in. So that's on the renewables. The gas, maybe Eugene, the gas margin, very still a few to point that out. I think for 2025, when we look across the gas, number one, we have the one time upstream curtailment gain. That was about 10 to 15 million. But outside of that, from a gas margin standpoint, we probably saw a 25 to 30 million downside impact. Now, so what has changed? I think the periods where you saw high double digits, actually higher than double digits, gas margins, if you are looking at the single dollar financials, which I know you always do, thank you for spending the money to do that.

[01:41:00] Then, those periods obviously are periods where there is volatility in the index. So when there's a volatility in the index, it gives our gas, I don't use the word trading, but our gas business, the opportunity to, I think arbitrage is the right word, to basically look at opportunities to a diverse gas and optimize gas cargo, right, and to have a larger amount of gas optimization earnings on top of what's contracted. Now, of course, when you see that going through 2024, 2024 is still fairly volatile, and then when you come back into 2025, You know, we have a problem. We are essentially seeing more stability between the you know The GKM index and also across the you know, the brand index of which our long-term prices work. So because of there is Lack of volatility. So our ability to drive, you know the same level of a gas Optimization or arbitrage gains, right? It's less right now

[01:42:04] Now the good news is that I think across 2025, we have been monitoring the gas margins in the first half, second half, it has been stable. So going forward, we don't expect the gas margins to be similarly impacted because it is trending more towards our base contracted level of gas margins. And we are not at single digit gas margins, we are actually still at the low double digit gas margins. Yeah. It's still we asking about the spot spread in the power side. No, you're talking about exactly what I'm saying. Yeah, sorry, thank you for the answer. Just one follow up. Coming back to China renewables, right? If your curtailment stays at this low teens number for the next one, two years, and let's say things do not deteriorate further, do I have to worry about impairment of the China renewable asset base.

[01:43:05] If not, at what point do I start to set up and pay attention? So I think in relation to our China asset base, we have always do very detailed impairment analysis. I think where we stand right now, we do not see the need for any impairment because from a policy standpoint, and Alex, you can help me to elaborate more, that the Chinese government have made a very strong stance that they will build the Northwest interconnection lines across to the eastern side of things. Now, the exposure for us for the very high curtailment, like I pointed out earlier on, it is really across the SDIC portfolio, okay? because that has significant exposure to the Northwestern side of things. And then also some of our Kwon C assets.

[01:44:09] Now, so of course, with that, we are confident that within a certain level of visibility, the curtailment situation will abate as these interconnector lines are built up, that the question is really about how long. Of course, we do stress test the outcome of our assets. So the curtailment situation will have to persist for rather long. And I'm talking about many, many, many years kind of long before you even worry about a curtailment. More specifically on the SDIC portfolio, if you recall, that is essentially one of our higher returning portfolio. Where we entered in at 1.8 gigawatts, organically it grew to more than double in terms of capacity. So when we look at our cost of investment for the SCIC portfolio, based on our analysis right now, it is very unlikely that you will hit any form of impairment,

[01:45:10] simply because our cost of investments. So just to isolate, those are the two key accompaniment. Alex, you want to do you highlight that on the lines? OK? OK. Gentlemen, in front. Nikhil, please. Hi. This is Nikhil Bandari from Goldman Sachs. So just sticking to renewables, but shifting from China to India, renewable. When we look at the overall, over five gigawatt under construction or secure portfolio, India is a big chunk of that. It appears that there isn't a lot of completion of projects happening in calendar 2026. It seems to be more heavy on 2728, 2030. Out of all of that portfolio in India, What percentage has already the PPA signed? What percentage already has the exit connectivity already

[01:46:11] secured, if we can help provide some color on that? That's the first question. OK. Renewable presidency of West. Use this. Yeah. We put this in the best position to answer this. Hi, thanks for the question. I think maybe to start with the second part of your question first, of the roughly 2 and 1,500 gigs of PPAs that are signed, I'm sorry, of 2 and 1,500 gigs of pipeline, about half have PPAs signed, about 1.2, and about half are at the LOA stage, where we are discussing with the various REIAs and the DISCOMS. As you might be aware, I'm sure, a few months ago, there was a push by the central government to try and clear that backlog. That has had the effect because all the REIAs then went around and said, OK, let's take a closer look at each

[01:47:13] of these LOAs. There are active discussions going on, typically, between generators like us. REIAs like Secchi or SGVN and the DISCOMs who would be the off-takers. Fortunately, with declines in equipment prices since the time that these PPAs were entered into, most generators, including us, are in a position to offer more tailored offerings within the same tariff range to the DISCOMs. So those discussions are proceeding. And of course, as and when we sign the PPAs, we'll make the necessary disclosures. So about half and half on the first one. Your observation on the pipeline is absolutely right. The way we look at it is that there will likely be some of our projects that are at advanced stage

[01:48:14] of construction will get completed in 2026. The bulk of the pipeline will indeed be 27, 28 thereafter, largely constrained by grid capacity availability or connectivity availability. But these estimates that we do are after we take into account whatever grid delays, and I'm happy to have a deeper discussion on that, but what we are seeing is considerable all of government effort across the central government, the state governments, the local governments to try and de-bottleneck the grids. In fact, if you look at the Electricity Act amendments that are now proposed which are widely circulated in the public domain, special powers to governments to acquire land and get grid done have also been included there. But I think coming back to the effect on us, the way we look at it is, it actually gives us a little bit of that respite

[01:49:14] to make sure that land acquisition, which is usually one of the bottlenecks for any renewable power development, we actually get much more time to do our land acquisition and be very true to our intent, which is to have 100% land acquired before we break ground. And so that is now what we are seeing in the projects that are coming forward. So actually what ends up happening is, say for a solar project, even a large one, let's say for 500 megawatts, the actual construction time is rarely more than a year or at most year and a half. Whereas the total elapsed time maybe two, three years, maybe even sometimes a bit more. So actually what we get is good enough time to get the land done, get the engineering done perfectly, get the EPC done perfectly, and then move on from there. Is it fair to say the projects we have until 2028 commissioning estimate

[01:50:17] has most of the land and the connectivity already secured? Connectivity is 100% secured. In fact, we have connectivity available for which we are yet to conclude PPAs. So that part is clear. Land, very, very advanced. So we are now, I would say, a very vast majority of land already done. And the rest will be done before we break ground. Another question just sticking to India renewable business. We heard a lot of news flow around some renewable power curtailment in India last year, especially concentrated in Rajasthan, Gujarat area. And we also started hearing some of the newer PPA's being signed have some curtailment clauses in it, up to 100 or 170 hours in one of the PPA, which is in the public domain signed. I'm asking this question because coincidentally maybe

[01:51:19] India has also hit nearly 50% of the power capacity mixed as renewables and hydro, with China hit that number probably three to four years ago. And that was the beginning of a curtailment phase in China. How do we think about the risk of great absorption, curtailment risk in India, given the system is so heavy now on renewable and some of the weather-related power generation? Thanks. That's also a very germane issue. For us in India, it works a little bit differently. The curtailment that has been talked about in the press and is part of a lot of concern for many people is basically when projects connect to the grid on a temporary connectivity. We call it TGNA. When you have temporary connectivity, then the grid's obligation is to give you these projects connectivity on a best effort basis, but then all bets are off as far as

[01:52:21] curtailment is concerned. So the moment there is any sort of congestion, those get backed down. Our projects are all on permanent connectivity. The moment you have permanent connectivity, any commercial backed down due to congestion or due to commercial reasons like demand is is recoverable by the generator. The only reason that grid curtailment can happen as per the PPAs, once you have permanent connectivity, is when there is a specific grid security issue, which typically will not occur for more than a very, very short period, typically a few hours here or an hour there. So the numbers that are being floated around in the press have nothing to do with our portfolio. If I look at our Rajasthan portfolio, I don't think we've actually disclosed these numbers, but I think it's fair to say our curtailment on that,

[01:53:21] including what we will recover back, part of which we'll recover back, is below 1% at the moment. And that too, a large part will come back. Just combining previous China-related questions and the questions related to India, Given China, we still expect some more deceleration in the earnings this year, and given there are more limited new project completions in calendar 26, should we assume any growth in the renewable business earnings in calendar 26? And also, while we don't assess any impairment risk right now, but can we quantify what percentage of our receivables, for example, are related to the China renewable business or any quantification if you can help us provide on the China exposure in the overall balance sheet. Thank you. I will ask Eugene to address that. But before we move off the topic of the development pipeline in India, hopefully what people has described to you is that when we come out and tell you that this X gigawatt says under development

[01:54:31] relative to maybe what other people might be talking about as pipeline, the quality and certainty that is behind it, you have to form your own judgement from what people are telling you. I think Nikhil's question is very straight forward. You tell me how much is it going to come when, is it really going to come later, are you going to say there's no connectivity, there's no land, no PPA, and so on. So without giving you a straight number, we are giving you the conditions under which we are, the way we develop projects and then the risks that we're taking or not taking. So hopefully I like to think that we are actually relatively when we say there's a pipeline, our pipeline is relatively of a much higher quality in terms of certainty and deliverable. So on the is there any guidance, Nick, you were asking for the renewables earnings growth? I think going into 2026 renewables as a portfolio,

[01:55:35] we think from an earnings perspective, it will likely be flat-ish to slight upside. Now, because there will have been better growth, but I think the reality is that we have hit with another 12 million down side because of the VAT policy change which came through, unfortunately towards the later part of Q4 last year. So as a result, we think renewables flattish to a slightly positive. I think for China, I just wanna characterize the issue. I think from a renewables book value standpoint, it stands roughly from the same dollars perspective, 1.8 to 2 billion of invested capital from equity standpoint. Now, from a receivables, right, the receivables that are exposed, which is largely in our HIME portfolio, that has not really cleared,

[01:56:35] that has not been given a green code in a subsidy audit is around 350 million, like $6, right? The total subsidy receivables on our books, really it's approximately 370, But those pending subsidy audit is about $340 to $350 million. Of course, we have made provisions against them. Provisions to date, there's about $43 million against that gross amount. Now, I think in relation to that, we continue to press respective authorities on being able to release those projects sooner rather than later. But I think what we have noticed is that for projects that have cleared the subsidy audit, they are actually paying down their receivables fast. And this is empirical, right? Because in our own portfolio, in our own Hine portfolio,

[01:57:36] the amount of subsidies receivables collections in 2025 was about 1.7 times that of 2024. We see it accelerating, no doubt. In our JV portfolios, we also see the subsidy receivables collections in 2025, roughly double that of the year before. So I think there is a clear effort from the Chinese government to clear the subsidy receivables. And we are certainly hopeful while we continue to provision against it, the subsidy receivables that has not yet cleared the audit. So, immediate 12 months renewables, we won't be seeing a lot of growth, but we're very comfortable because the pipeline is strong and we have got new markets. Middle East in addition to India is actually very active, if I have to use that word as you would know, and also now in Australia is coming in.

[01:58:40] So we think I'm not too worried about the 2028 target if that's a follow-on question. Yeah, so yeah. Maybe also just to add what we are seeing, particularly in India but also in other markets, is many competitors have overextended themselves. And there are now assets available, which makes sense for us. We are now in a position to be able to acquire attractive prices, add value through refurbishment and operations as we find the opportunities. So that's the other one. These are all the way from relatively small to relatively meaningful opportunities. Can we have Suki at the back, please? No, no, but the lady. She has a sign up for a while. Sorry, Suki. Sorry. Rachel first. Hi, this is Rachel from UBS. I'm very sorry, Suki, for hijacking you.

[01:59:43] I have two questions. The first one is that on SEI's ex-sanoko power plant contracting profile, does this include the new 600 megawatt plant? Because in H125, only 13% of the portfolio had expiry profile of 0 to 5 years. And now it's 21, so I'm trying to reconcile that. So that's my first question. My second question is, what's the principal payment for the DPN versus the interest payment. Thank you. When we say 80% contracted five years or more, it's 80% of what? Does it include the 600 megawatt plan? Maybe if you bring up the slide, Jun.

[02:00:47] OK. So you are referring to the SAMCOC only contracts contracting where zero to five years has gone up to 21%. I think there are a couple of effects there. Number one, mainly it is due to high, basically we are also contracting a little more in terms of a volume, right? Because we have secured more contracts that are of a shorter term nature as well. So essentially, from a contracted perspective, historically when you saw that 13%, that was of a contracted capacity of about 960 megawatts or so. But I think we have also increased contract levels at the shorter term level. It has gone up to about close to 1,200 megawatts already. That's on the Singapore side. So the base is 1,200 megawatts.

[02:01:49] Today our existing portfolio is less than 1,000. Yes or no. So when we showed the guidance earlier on at half year, where it was 13%, right? So at that point in time, the contracted capacity for generation was about 960 megawatts, right? So we did say that it is one of our intent to assign more contracts. So even over our Singapore portfolio, we have contracted up to 1,200 megawatts already, and some of these are shorter term contracts Because we do want to increase their contract levels. And hence, you see the zero to five years increase to 21%. So essentially, there's 21%. But the total base of this is no longer 960. It is now about 1,200. So in a way, it has included 600. In a way, it hasn't. You see what's going on? Because what we're saying is that we want to sell 1,200 megawatts of which some are long contracts, some are shorter contracts.

[02:02:50] And what happens is that when a new plan comes in, because this is much more efficient, what we'll do that will back out some of the older ones. So we can't, I would guide you to not say that, look, when the new plan comes in, then suddenly our revenue, our megawatts will go up by 600 megawatts, and our revenue is supposed to go up by 600 megawatts. It doesn't work that way, right? It's a portfolio, right? So what Eugene is saying is that, yes, it is in there. So because part of the 10-year contract and the five-year contract will be served using the new plan, right? No, it is not in there. We didn't edit up in blocks like that. So hopefully that clarifies the thinking. So I think Richard you have heard me talk about this because you stumped me a little bit. Because we don't think in terms of, I stumped you, right? Yeah. Because we don't think in terms of, oh this plan and I contract for this plan, right? We think it's okay, so our capacity is thousand two, potentially going up to thousand eight, but today if we see opportunities to contract ahead or over contract with a forward start, then we will just increase our contract. But I think that maybe the first time we told them

[02:03:52] it's 1,200. So yeah, maybe Jin will note to put a footnote or something. A question on the DPN. OK. So for DPN, for the principal interest payment, I think Rachel, in general, there is no fixed principal payment. So essentially, if you look at the mechanism, how it works is that whatever equity cash flows is generated at the plan level, it will be a full sweep of the cash, leaving 6.75% of the equity cash flows to the owners. So I think in general, that is the basis. So we have not, there is no fixed principal repayment. But I think what we can look at is over the, from a principal pay down standpoint, over the last three years, we have collected 1 billion,

[02:04:54] of which the principal has ran down from roughly 2 billion at the start of the period to about 1.3 billion currently. So which means that on average, the principal pay down is about 300 million a year. So I think going forward, we do expect the SEIL equity cash flows to be similar, simply because they are covered by long-term contracts. So that would roughly be the pay down. Interest cost is still around 8.75% to 8.9%. Sorry, Suki. Hi, thank you. Suki from CGSI. I have two questions. On gradual increase in dividend to benchmark against yourself with peers, who are the peer group that you're looking at? you looking at yield payout and given that your earning space is potentially stable at a billion, would you target to increase your yield to about 5%? That's my first question.

[02:06:02] Second question is thanks for guiding us on the SPARK spread. With much more power coming into the market, would you be able to have a guess on what would be the SPAC spread into 2027? And I remember previously we were hoping to actually get more long-term contracts or convert some of the short-term contracts from Senoko to long-term. How realistic is that? Thanks. I think in terms of the dividend benchmarking, Suki, we look at the benchmarking in two sets. is across more broadly STI comps. Of course, then within the STI comps, we look at both payout ratios as well as dividend yield. So excluding REITs, we do notice that average dividend yield is around 5%. So our yield is about 4% or so. But I was hesitant to say that we are targeting a yield

[02:07:03] as you keep because of my payout ratio is kind of low. So we are at a 40-ish percent right now. Though we do note that, number one, the average STI, broader comps, the payout ratios are 60% or more, right? And then if we compare to a closer TLC industrial companies, right, you know who they are. Just to name a few, includes a capital, includes ST engineering. They are payout ratios in the longer term in excess of 70% or so. So these are some of the guidelines that we are looking at. Now, we also benchmark payout ratios as well as dividend yields to broader jankos, both Asia-Pacific as well as European players. So in those situations, we do see average dividend yields also in close to a 5% range.

[02:08:04] and average payout ratios for those are in the 60 to 70% range as well. So I guess this is to guide you in terms of how we think in terms of the payout. Now, I just want to caution a little bit about the yield perspective, because at the end of the day, while those are guidelines for ourselves, we are still focusing more on the absolute dividend and sustainable and growing over time. So I guess the key point to note is that where the dividend is going forward, we will have the ability to grow it both from an earnings perspective and also looking at where our payout ratio stand relative to those benchmarks that I mentioned. And in the Singapore gas market, our gas-fired power market, what would be the spreads into 2027? I don't have a crystal ball at the moment. If you go out there to contract, You're getting mid 30s.

[02:09:05] So that's, you could see that still OK. So the part that I described just now, they are going into new contracting. They will be contracting in that range. So the 47% in Sanoko will be contracting into that range. The 5% from the same cup portfolio will be contracting into that range. Whereas the outlook for longer term contracts, actually, Singapore market is very small. So it is quite binary. If you secure the customer, like in our case, Micron, Singtel, then suddenly there will be one big chunk that will come in. So there is a group of customers that will be prepared to sign long-term contracts. And that group of customers is a finite universe today, even as the new data center is coming in to increase that port line. So what we're seeing is that, as I mentioned, I at the beginning of my delivery, we are very well positioned to chase after both the

[02:10:06] existing ones as well as the newcomers. So what is really specifically to Senoko, you will see I'm very confident to say that we will be able to increase Senoko's pie chart to look a lot more longer term than what it is shown today, but I have to tell you exactly how much, because it depends on the lumpy big customers that will come in. And if you think about it, and they are indeed lumpy, because when a data center comes along, it's 30 megawatts, 50 megawatts, and so on. So it will suddenly shift the profile of that donut over there. Next question from Sumit. Hi. Thank you for presentation. Sumit from JP Morgan here. Just have a couple of questions, maybe, on capital allocation.

[02:11:08] So do you think currently you have any non-core assets that may be up for disposals, the other businesses, even the UK plans? Any thoughts on that? And also, you did mention that actively looking at capital recycling in India. May I ask what's the progress there and any timeline you have in mind? And perhaps my second and more housekeeping question, I think in one of the slides, you mentioned that one third of DCs being catered by gas and related segment. Is that your own business or are you talking about the broader Singapore market? Thank you. The first question was non-core assets for disposal. I was trying to look at Eugene and he was trying to look at me. Now, the portfolio in Singapore,

[02:12:09] I think we managed the entire portfolio for value. I just want to reassure everybody, that's the first thing. And over the last five years, we have made several changes to the port. So, I think we already reorganized ourselves into the three big business segments. So, gas related services, renewables, most of the contributors actually squarely slot into them. So in the long run, we do not have, I don't want to, the smaller businesses, even if there is a non-core disposal, I wouldn't, I don't think it would be something that should bother you.

[02:13:10] So let's put it that way. Now each of the lines of businesses, they are all growing up. And as they grow up, as you rightly pointed out, the India IPO possibility, that itself is actually something that is much more symbolic and significant to the portfolio if it happens. So in terms of, but to us, the India renewal portfolio is a core asset, right? So that's not a non-core. So I wouldn't put that in the category of the first question. So maybe the short answer to it, having thought very loudly in front of you, the short answer is no. And the second one is in terms of capital recycling, we are thinking about it actually for the rest of the portfolio as well, including China, if the opportunity arises. And five years ago, I would tell everyone that look, you know, we're still too small in most of the pieces.

[02:14:11] So now India has grown up and China is in a certain state. So when things are ready, we would definitely be managing them for value. So I just want to reassure you that in terms of actual timing, I am warned many times do not say that because we have a plan. There are typical timelines in India, how quickly you can do certain things. And of course, there's no certainty until the moment the button is pressed. There are people who built a book and then decided that all of this book doesn't look good enough. I don't want to do it. So you can. I don't think we would have the ability to do things much faster than the next guy who is falling. That's pretty deadly. So if you apply the usual timeline, that's a good way to think about if it happens.

[02:15:14] I'm sorry I'm not answering your question. I'm struggling a little bit, but I have got strict rules tying my hands behind me. So Sumit, do you have any other? I just had that quick follow up. I think the data center slide, I think the slide that you mentioned where you have AI opportunities and I think in gas and related segment, you show that one third of data center. Yeah, this one and that first bullet, I just want to understand what it represents. Is it like for Singapore data centers, is it one third of demand being catered to by your own plans? Is that what you're referring to? Sorry, I forgot about that. Oh no, just to be clear, this one is, we have highlighted that before, maybe we were not so clear in this bullet. We are supplying power to one third of the current data center in Singapore, right? So Singapore 1,400 megawatts of IT capacity.

[02:16:15] PUE is probably 1.25, 1.3, I think it's 1.3. And then so you multiply that, that is the quantity that we are supplying to. So it's fairly strong. And I think it's also instructive to note that the one third of our capacity that we capture for these data center companies, they are of longer term of BPA's. So our understanding is that the other two thirds, they are not really covered by long-term BPA's of our women. Okay, we'll take questions from the web first. There's a question from Mayang from Morgan Stanley. He's asking about the UK impact on earnings and outlook in 2026 as there's also the ability to put DC capacity in the UK. In terms of China, any plans on adding battery investments into China for 2026? And then lastly, if we can share any performance highlights

[02:17:16] from Alinta in the second half of 2025. You wanna take that? Performance highlights from Alinta in second half of the year. Okay. I think, Amayank, in relation to a performance for Alinta, we certainly have not competed yet, but I think, you know, we will be in a position to speak more about Alinta once we have completed the acquisition. You would imagine that we can't. We just can't. Now, of course, you could draw broader market performance from the listed guys. You've got Origin. You've got AGL. It may not be directly comparable. You would just have to bear in mind that if there's any earnings volatility as a result of a cause of supply, that is not an issue for Elinter. So you can take guidance from where the other two guys,

[02:18:21] how they are doing. But of course, pressure, if there's any volatility caused by cause of supply of electricity, we will be a lot more insulated because we are very long. And when we talked about the Elinter acquisition, we showed the historical earnings profile, right? Yes, that's right. So 2024, we also showed the profile, no? Yeah, so in 2024, from a underlying earnings standpoint, they are doing about 400 plus. 400 plus, right? Yeah, of course. So if they're not gonna suddenly go to 600, they're also not gonna suddenly drop to 300. Yeah, okay. So that's, so you can apply six months, overlay with the amount of debt that we're putting on top of it, which we have also disclosed, right? Yes, so the level, we do expect the level of accretion in the second half of 2025 to be, you know, similar to what was disclosed. Yeah, but to also point to the fact that because their

[02:19:27] first half is their winter, so typically the first half is stronger than the second half, Yes. Sort of 60% to 60% in the first havala, 40% in the second havala. Right? So hopefully that helps my young. Any battery investment in China, even if there is, it will not move the needle. All right? But he is being very kind. Thanks, Niko. He's being very kind. He's saying that, hey, look at your work, because then maybe you should go in some batteries so that then you don't waste the power. So thank you for that. UK impact on earnings, Mr. Cheng. I think, as highlighted earlier on, the UK gas business in 2025, we saw a 20 million impact for the UK gas business. Now, of course, when we look into 2026, there are hit wins and also the possible and also positives.

[02:20:27] The hit wins, of course, the customer demand continue to be under pressure simply and power prices as well simply because you know the key you know some of the key customers in Wilton they are you know petrochemical players and we all know that the petrochemical sector is under pressure right now so that is you know the hit means that we expect going into a 2026 now of course we did we are excited because you know the value of of powered LAN, particularly for data centers is important, and Wilton is powered LAN, right? So we do, you know, at a very initial stages of engagement, have seen, you know, a DC player's interest, right, in our UK Wilton site. So, you know, we hope to be able to see more developments there, but of course, you know, barring, you know,

[02:21:28] positive developments on the DC capacity. We do expect the UK to continue to be under pressure as we go into 2026. I'll take another question from the web. This is from Louis Citi. He's asking about the run rate for the gas and related services segment. So should we look at the second half GRS level to be roughly the 2026 run rate? And will the winter expenses be booked in the first half if the transaction closes by end of first half of 2026 or will it be booked at the year end? Okay, so Luis, to answer your question on the first point, I think from the second half of 2025 going into FY2026, I wouldn't say that we could use that level because a couple of things would have to bear in mind. Number one, you know, into 2026, roughly 3-5% of the Singapore

[02:22:33] portfolio would be up for renewals. So those renewals would be at roughly $35 type of a spark spread. So, you know, that would be coming off, you know, historical high short-term contracting spark spreads of $70 or so, like $70 to $80. So that's one impact. Second impact is for Sanoko, we did highlight that coming into 2026, you have a full year impact of roughly 20% of the portfolio

[02:23:10] that was a renewed in the second half of 2025. Also, $30, $35 spark spread. And in 26 itself, we would have about 47%, close to 50% of the Sanoko portfolio that will be up for renewables. Indications clearly show that Spark spreads will be around 30 to 35. So you do have to factor that into your outlook for 2026. Now for the exceptional expense of a 208 million, it will be reflected whenever the transaction close, right? So if the transaction close in the first half, that 208, the bulk of it will be booked as exceptional items by half year. If it close beyond 30th June, then it will show up in the second half. So it's really a timing-related bulk of that. It's driven by STEM duties. So it's really linked to the timing of the completion of the transaction.

[02:24:13] Question from a share, business times. Thank you for the presentation. I'd like to ask a bit more about the data center strategy in terms of supplying energy for DCCFA2. There is a requirement, I think it's at least 50% has to be like clean power. So for yourselves, like what sources of clean power do you see yourselves providing in terms of fulfilling this demand from DCCFA2? And also I think for other markets in the region where you hope to power data centers, Do you see it mainly being gas or more renewables? The specific requirements or rather the requirements of the DCCFA2, my understanding is it's actually quite specific. It will have to be new sources. So it is not existing. So my solar panel doesn't come. So we are working with our customers who are interested to win the DCCFA2 to provide them

[02:25:18] with new sources that include green power from biofuel, that includes fuel cells, right? So the array of potential solutions that can qualify for this new green source, we actually have them as part of our toolkit to supply them. The question really is for each one of them, because difference in size, difference in technology, difference in customer base, their appetite to absorb the cost from some of these new sources is different. You can imagine some of these new sources is at higher cost than your solar. So that's why what I'm trying to say is that we have those solutions and we are working with each one of them to tailor it for their specific requirements based on their affordability. So that's on that. Now the other one I want to say is that for generically, like you say, whether it is in

[02:26:19] the region or even in Singapore, at the end of the day, data centers, they need very stable, reliable power. Highly reliable, in fact. They don't want interruption. So the new sources generally on the one hand will put cost pressure, on the other hand very often it may not be as reliable. And certainly even if you are reasonably reliable you still need to backup from existing sources be it from batteries, be it from gas, be it from the grid. So this is where SAMCOC believes we are actually very well positioned because we have the entire array. In Singapore we have got the gas fire power plants, we have our solar panels, we have the largest factory in the region and then on top of that we have got these new sources, biofuel, fuel cells, so on and so forth. So we are able to say that hey look, even as you take the new source, we can supplement it and support it and provide insurance and reliability by giving you everything else.

[02:27:22] So that is where we have that strength. In the region it is the same. So when we go to a batam, this is something that we can offer. And our experience doing this is also giving them confidence. If you're getting this from Sam Cobb, that's one story. If you're getting this from only a solar player, you might actually have to think twice because, hey, how good are they even if they offer you batteries? But I've got gas. I've got other sources. And I have shown that I am able to keep reliability very, very high as a portfolio. So that's where even in places like India, not just Indonesia, we are seeing some of these demands coming. And we are, on the slide that we show here, we are signing up, actually beginning to sign up some of them. So coming back, I also want to reiterate the point that by the time we see the demand from the AI side, we are seeing the real thing.

[02:28:22] This is the solid demand. This is not the fluff. So because I'm very worried that people say, oh, you know, this same car suddenly turn around and want to enter into the AI space, are they going to catch the fluff and then get caught up? No, no, no. By the time it comes to us, it is a solid energy side of the demand, not the AI demand. We don't take that risk. We are selling power. We are selling reliable power. And we demand and expect that our customer is a reliable pay master. Import licenses. I understand you have import licenses from EME, right, for like Sarawak and also from Vietnam. Would the new sources that you supply to DCs also include like green power that you're importing? My understanding is that imported green power doesn't count. Oh, it doesn't? Oh, okay. Yeah, and we can confirm that after the meeting. My understanding is that they don't count. Oh, okay. Yeah, so but if they count that, we also have that, right. So in fact, last year we imported some,

[02:29:24] And then that contributed to some of my losses in the previous year. It was a good, what, 40 million. So yes, the Malaysia one. So I'm glad that it's almost over. So it will not weigh so heavily onto 2026 anymore. Any other queries? Yeah. No further questions? If not, that marks the end of today's briefing. Thank you very much for attending the briefing, everyone. Right, and again, you know, two things to take away if I may. In terms of returns, you know, can expect dividend to steadily sustain and grow. And we recognize that we are behind the curve compared to our peer group in terms of payout, in terms of yield. So, and we, because of our strong balance sheet, strong cash flow, we are very confident increasing the dividend along that path to cover that gap.

[02:30:28] That's the first thing. In terms of growth, at least for the next few years, we have got new markets that we are venturing into and we are seeing success. In the case of Australia, there's a linter, very skilled, very committed to decarbonisation and also very energy-shot. In terms of other greenfield opportunities other than a very hot India market where we have strong establishment, there is also Middle East. They are giving us the pipeline. So there is returns, there's growth. You know, 2026, we will have headwinds, but we are very confident sailing into 26 and beyond. So thank you very much. Thanks. Thank you. Okay. Is there food outside? There is. Okay, so sorry. Sorry to hold you. There's food outside and you know, please feel free to help us consume it.