SMID Research · Singapore & Asia small-mid cap library

Civmec Limited

Australia · Heavy engineering, construction & shipbuilding

ASX: CVL · SGX: P9D · Information cut-off 28 August 2026

Investor snapshot

Latest figures

FY2026 revenue was A$903.0m, operating cash flow was negative A$23.1m and net debt including leases rose to A$71.7m, even though the longer FY2019-FY2026 record still shows A$438.5m of cumulative operating cash against A$325.9m of profit.

Business model

Civmec fabricates and installs large engineered structures for resources, infrastructure, marine and defence customers, recognising revenue as contracted work progresses.

Main risk

The central risk is that working-capital swings, order-book definitions and the acquired naval programme obscure underlying cash generation.

Next proof

The next test is the next results' contract cash flow, order-book bridge and defence-programme contribution.

Information cutoff 28 August 2026, 07:45 AEST. The latest reported period is FY2026, the full year to 30 June 2026 — Appendix 4E, condensed statements, audited report of the directors and financial statements, media release and investor presentation. The issuer documents are dated 27 August; the official ASX tape lodged the complete matching seven-item package at 07:45 AEST on 28 August. The audited accounts carry an unmodified joint opinion from Moore Australia Audit (WA) and Moore Stephens LLP; the condensed half-and-full-year statement states on its own face that those figures are neither audited nor reviewed. Every number below is as reported in a primary filing or computed from one, with the computation shown.

Business strengths and risks

The live questionWill the receivable and contract-asset book built up in FY2026 convert into collected cash as progress claims are certified and billed?FY2026 turned operating cash flow to an outflow of A$23.1m even as reported profit rose, so collection of work already performed now decides whether the improvement reaches cash.

What improved

Second-half revenue was A$522.5m against A$307.7m a year earlier, up 69.8%; group profit to owners rose 22.5%, driven by Resources gross profit up 37.5% to A$67.3m on margin recovery; the order book was stated at A$1.4bn at 31 July 2026.

What became more demanding

In the same year working capital absorbed cash: contract assets rose A$122.7m to A$277.7m, 112 days of revenue against 70; lease-adjusted net debt rose from A$17.6m to A$71.7m; and surety-bond utilisation rose from 45.9% to 67.7% of its limit.

Strongest alternative explanation

The absorption could be gross-up and growth funding rather than deterioration: A$128.315m of receivables and an identical payable came in with the acquisition as a Commonwealth-to-vendor pass-through, and a second half growing 69.8% funds unbilled work before certification. That does not by itself establish a collection problem.

The decisive missing fact

The closing Commonwealth receivable and NVL payable are disclosed. The next test is how their collection and settlement, alongside progress-claim certification, explain the working-capital cash-flow movement rather than merely the balance-sheet difference.

Private library

On this page

Business anatomy · from inputs to customer value

Designs and steel become large structures at customer projects

Civmec owns the fabrication and construction step; the project owner or prime contractor owns and operates the completed asset.

Follow the operating chain from demand or inputs to customer outcome and cash.

  1. Customer needProject award

    Receive the design package

    What happensAn energy, resources, infrastructure, marine or defence customer awards work with drawings, specifications and milestones.

    Commercial triggerThe contract establishes scope, price and progress-payment terms.

  2. Company actionOwned yards

    Fabricate at scale

    What happensStructural steel and engineering move through Civmec’s yards to become modules, bridge sections or naval hull blocks.

    Value createdEngineering and fabrication progress create contract revenue.

  3. Customer deliveryProject site

    Deliver and install

    What happensLarge fabricated structures are transported, assembled or installed into the customer’s wider project.

    Revenue triggerCertified milestones convert physical progress into billings.

  4. Cash conversionCustomer cash

    Collect against progress

    What happensThe project owner or prime contractor accepts the work and pays Civmec under the contract.

    Cash triggerCash timing follows certification, claims and collection—not only reported profit.

AI-assisted illustration, representative only. Figures from company filings to 28 Aug 2026.

Cash and balance-sheet risks

Value lever
Converting a large order book into margin and cash without cost overruns or claims leakage.
Cash bottleneck
Work in progress, contract assets and retention are funded before customer certification.
Balance-sheet pressure
Project cash, bonding capacity and committed facilities cannot cover completion and debt service.
Next proof
Award quality, certified progress, contract cash conversion and margin on the current backlog.
Text version of this comic
  • Customer need · Receive the design package An energy, resources, infrastructure, marine or defence customer awards work with drawings, specifications and milestones. Commercial trigger: The contract establishes scope, price and progress-payment terms.
  • Company action · Fabricate at scale Structural steel and engineering move through Civmec’s yards to become modules, bridge sections or naval hull blocks. Value created: Engineering and fabrication progress create contract revenue.
  • Customer delivery · Deliver and install Large fabricated structures are transported, assembled or installed into the customer’s wider project. Revenue trigger: Certified milestones convert physical progress into billings.
  • Cash conversion · Collect against progress The project owner or prime contractor accepts the work and pays Civmec under the contract. Cash trigger: Cash timing follows certification, claims and collection—not only reported profit.

What the company is

Civmec recognises fixed-price and schedule-of-rates construction revenue over time as it executes contracts. Unlike asset-light contractors, it owns its facilities: A$619.6m of property, plant and equipment against A$903.0m revenue at 30 June 2026. Its principal asset, Henderson in Western Australia, has a 70,000 m² undercover fabrication and assembly hall, including covered shipbuilding, on 200,000 m²; the issuer rates annual throughput at 80,000 tonnes. The Henderson buildings stand on leasehold land; its three land leases date from 2010, 2014 and 2016, each renewable. Tomago, Newcastle adds 227,000 m² and 25,000 tonnes; newer sites are at Port Hedland and Gladstone.

FY2026 customer-location revenue was Australia A$903.0m — 100%, as in every year since redomiciliation; no revenue was offshore.

Civmec reports Energy, Resources and Infrastructure, Marine & Defence. The issuer aggregates Infrastructure with Marine & Defence “as they have similar long-term average gross margins”. That description failed in FY2025 but fitted again in 1H FY2026.

Three structural breaks the series must respect

Three structural breaks prevent one comparable revenue series from listing; two fall in the same year.

BreakWhat changedEffect
FY2019Presentation currency changed from Singapore dollars to Australian dollarsFY2018 revenue of S$738.7m becomes A$712.9m — an implied 1.0363 S$ per A$1
FY2019Adoption of SFRS(I), including SFRS(I) 15 on revenue from contracts with customersFY2018 revenue a further A$10.4m lower and profit A$7.3m lower, to A$702.4m and A$17.4m; basic EPS restated from 5.07c to 3.62c
FY2026Acquisition of Luerssen Australia Pty Ltd, completed 1 July 2025 and renamed Civmec Defence IndustriesNet consideration A$17.5m (A$20m cash less a A$2.5m recovered-claim contribution), nil goodwill, and A$36.5m of cash acquired — a net cash inflow. First consolidated in 1H FY2026; FY2026 is the first full year of it, and is the year the segment mix breaks — Resources falls from 79% to 65% of revenue

The issuer’s FY2018 bridge (FY2019 annual report, note 32) ties: A$712,850k translated revenue less A$10,435k SFRS(I) 15 adjustment equals A$702,415k restated.

As-filed history

Australian-dollar history, on the current framework:

A$’000FY2019FY2020FY2021FY2022FY2023FY2024FY2025FY2026
Revenue488,511391,868674,186809,295830,8661,033,473810,586902,984
Gross profit25,53344,65175,03890,837109,171119,03192,940104,685
Gross margin5.2%11.4%11.1%11.2%13.1%11.5%11.5%11.6%
EBITDA (derived)24,01238,53473,77094,530109,079120,75091,689107,323
Profit before tax8,99222,76650,19769,98382,57191,49160,57574,148
Profit to owners6,07517,58634,77150,76257,65564,40942,53652,096
Basic EPS (A$ cents)1.213.516.9410.1111.4212.708.3710.23
Operating cash flow78,86195,20158,2631,77495,24071,35460,912(23,117)
Cash capex68,22770,03921,6166,90419,88025,2104,8155,400
Net debt incl. leasesn.a.88,73866,58589,08042,95732,84017,57171,732

Non-statutory EBITDA is derived as profit before tax plus total finance costs plus depreciation. Lease interest sits in cost of sales (A$3,797k in FY2025; A$3,993k in FY2026), outside the P&L finance-cost line. Including it gives FY2025 EBITDA of A$91.7m (11.3%) and FY2026 A$107.3m (11.9%), exactly matching both issuer figures to the cent. Net debt uses ending borrowings plus leases less cash.

Singapore-dollar history, as originally published, contains the only completed downcycle:

S$’000FY2012FY2013FY2014FY2015FY2016FY2017FY2018
Revenue328,654405,924433,677499,153396,752345,955738,741
Gross profit60,79469,94763,75562,10743,49537,05947,724
Profit to owners30,31036,04935,07930,30817,4418,42726,225
Basic EPS (S$ cents)6.057.207.016.053.451.685.23

Revenue fell 30.7% and profit to owners 76.0% from FY2015 to FY2017 as the Australian mining-capex boom ended. Civmec came through without a rescue equity raising; a series starting at FY2019 omits this.

Revenue and profit to owners by financial year, FY2019 to FY2025
Chart notes.
Gross, EBITDA and net margin by financial year
Chart notes.

Segment economics — and the disclosure gap

Segment capital returns cannot be computed from the public record. FY2025 note 32 says the Group “does not identify nor segregate its assets and liabilities in operating segments as these are managed on a ‘group basis’.” Its “Segment assets” block allocates only A$10k of intangibles to Resources, as in FY2024. FY2026 note 4.1 repeats A$10k, leaving A$1,210.1m assets and all A$628.7m liabilities unallocated (30 June 2025: A$906.8m and A$381.4m); capex is group-only. This page estimates neither segment asset returns nor net capital employed nor profit share against asset share.

Correction, 18 August 2026. Previously this paragraph wrongly said “no segment assets and no segment liabilities disclosed in any year” and quoted “as they are managed”. The blocks exist but are almost entirely unallocated; the filing says “as these are managed”. No meaningful capital allocation is disclosed. Verified: FY2025 directors’ report and financial statements, printed p112–113.

Disclosed “segment results” equal group gross profit exactly in every year, despite the less specific label; revenue is also disclosed by segment.

A$’000FY2021FY2022FY2023FY2024FY2025FY2026
Revenue
Energy38,31730,19242,96031,03965,188105,690
Resources559,781630,902678,581876,478641,231587,112
Infrastructure, Marine & Defence76,088148,201109,325125,956104,167210,182
Group674,186809,295830,8661,033,473810,586902,984
Segment result (= gross profit)
Energy4,2893,4135,4804,3328,07514,332
Resources65,48871,32689,46796,77148,93667,288
Infrastructure, Marine & Defence5,26116,09814,22417,92835,92923,065
Group75,03890,837109,171119,03192,940104,685
Segment margin
Energy11.2%11.3%12.8%14.0%12.4%13.6%
Resources11.7%11.3%13.2%11.0%7.6%11.5%
Infrastructure, Marine & Defence6.9%10.9%13.0%14.2%34.5%11.0%

FY2021 Infrastructure, Marine & Defence gross profit is derived by difference; all other cells are reported. Segment revenue and results sum exactly to group totals in all five years.

The FY2026 full year settles both FY2025 anomalies

FY2025’s margin anomalies unwound as the half-year suggested: Infrastructure, Marine & Defence fell from 34.5% (11–14% historically) to 11.0%; Resources recovered from 7.6% (11–13% historically) to 11.5%. Both reflected timing, not new levels.

What that leaves is a result whose shape is not the one the headline suggests. Group profit to owners rose 22.5%, and the segment that produced the increase is Resources, whose revenue fell: A$587.1m against A$641.2m, down 8.4%, with gross profit up 37.5% to A$67.3m on the margin recovery alone. Infrastructure, Marine & Defence did the opposite — revenue doubled to A$210.2m as Civmec Defence Industries consolidated for a full year, while its gross profit fell 35.8% to A$23.1m. Energy grew on both lines, from a small base.

Appendix 4E item 2.6 attributes revenue growth to Luerssen “and the increase in activity within the Resources segment which saw the commencement of several large projects”. Yet Resources fell 8.4% for the year; twelve pages later the filings say “reflecting lower activity levels during the year”. Resources growth was second-half: Resources revenue rose 55.6% half-on-half, from A$234.3m in 2H FY2025 to A$364.5m in 2H FY2026. The driver is correct for the second half, wrong for the full year; the filing leaves its meaning unclear.

The half-year note that got there first

The half-year detail is in 1H FY2026 interim note 26, published 12 February 2026:

A$’0001H FY20251H FY2026
Energy — revenue / gross profit28,114 / 2,11259,637 / 8,244
Resources — revenue / gross profit406,943 / 27,969222,658 / 24,321
Infrastructure, Marine & Defence — revenue / gross profit67,804 / 25,70298,148 / 12,301
Group502,861 / 55,783380,443 / 44,866
Energy margin7.5%13.8%
Resources margin6.9%10.9%
Infrastructure, Marine & Defence margin37.9%12.5%
Group gross margin11.1%11.8%

The Infrastructure, Marine & Defence spike centred on 1H FY2025 (37.9% versus 28.1% in 2H), consistent with completion-driven recognition. By 1H FY2026 it was back to 12.5%, while Resources recovered from 6.9% to 10.9%. On 17 August 2026 this page concluded “the FY2025 full-year Resources margin of 7.6% was a trough, not a new level”. FY2026 confirmed 11.5%; the half-year note gave six months’ warning.

The Luerssen acquisition, as disclosed

Interim note 12 gives Luerssen Australia’s provisional purchase-price allocation (now Civmec Defence Industries):

A$’000Acquisition-date amount
Cash consideration20,000
Less: contribution to Civmec from CoA recovered claim(2,500)
Net value of consideration17,500
Cash and cash equivalents acquired36,533
Trade and other receivables128,315
Property, plant and equipment / right-of-use assets3,364 / 1,803
Trade and other payables(128,315)
Contract liability(22,195)
Lease liabilities(2,017)
Total identifiable assets and liabilities17,500

Identifiable net assets exactly equal net consideration: no goodwill. A$36.5m acquired cash exceeded A$20m paid, a roughly A$16.5m net inflow. Contracted confidentiality prevents separate contribution disclosure, the issuer says; FY2026 repeats that refusal verbatim. Acquisition-date amounts are unchanged from the interim note: no measurement-period adjustment.

Correction, 27 August 2026: the acquired contract liability was not released, contrary to this page’s expectation.

Interim note 12, published 12 February 2026, said the liability “will be amortised on a straight-line basis over its estimated useful life of 4 years being the length of the contract, starting from the acquisition date”. This page derived roughly A$5.5m annual non-cash profit to FY2029. Its 18 August 2026 correction attributed about A$2.8m to 1H FY2026 gross margin, restating 11.8% as approximately 11.1% excluding it.

FY2026 note 13 reverses that policy. Management “concluded that no release of the acquired contract liability should be recognised during the current financial year” and “will continue to assess the appropriate timing and pattern of release as the contract progresses”. The balance remained A$22.195m at 30 June 2026.

FY2026 profit of A$52.1m therefore includes none of that non-cash credit. The reported 1H FY2026 margin of 11.8% stands; this page withdraws its 18 August adjusted 11.1%. All A$22.195m remains in contract liabilities: future credit with unknown timing, not a run-rate. These three favourable consequences were absent from the earlier page.

A$5.5m and A$2.8m were explicitly this page’s derivations, not issuer disclosures. Policy changed; arithmetic did not fail. Verified: 1H FY2026 condensed interim statements, note 12, printed p13; FY2026 condensed statements, note 13, printed p25.

The A$92.8m payable to Naval Vessels Lürssen at 31 December 2025 covered pre-acquisition milestones. Acquisition receivables and payables were each A$128.315m, identical to the dollar. The interim statements identify “outstanding pre-acquisition contract milestone payments recoverable from the Commonwealth of Australia” and matching payments “through to NVL Australia GmbH in accordance with the Share Sale and Purchase Deed”. Civmec collects and passes them on: economically neutral, no profit effect, but grossing up the balance sheet and flowing through cash-flow working capital. That matters below.

Segment share of group revenue, FY2021 to FY2025
Chart notes.
Segment gross margin by financial year, FY2021 to FY2025
Chart notes.

The FY2025 performance review attributes the increase “mainly due to the timing of profit recognition from the completed Boorloo Bridge project (known as the Causeway Pedestrian and Cyclist Bridges)”. The issuer does not quantify it anywhere. The segment’s FY2021–FY2024 aggregate margin was 11.6% (A$53.5m result / A$459.6m revenue). Applied to FY2025 revenue, it implies roughly A$12.1m gross profit versus A$35.9m, a A$23.8m benchmark gap. This computation shows scale; it is neither issuer disclosure nor estimated “abnormal” profit. Timing shifts profit between periods, not its total.

FY2026 tested the pre-acquisition benchmark: margin was 11.0% on revenue two-thirds above any FY2021–FY2024 benchmark year, against 11.6% historically. The performance review again cites “primarily due to the timing of profit recognition from the completed Boorloo Bridge project in FY2025”. The issuer still does not quantify it in either direction. The new evidence supports a low-teens underlying margin, not the FY2025 print.

Infrastructure, Marine and Defence share of group revenue versus share of group gross profit
Chart notes.

Customer concentration

FY2026’s segment note reports three major external customers across Resources and Infrastructure, Marine and Defence, approximately 50.09% of external revenue (FY2025: three, all Resources, 51.4%; FY2024: two, 53.5%). Only A$10k of segment assets is allocated, preventing a capital-exposure comparison. The 2012 IPO prospectus reported five customers at 88.3% in FY2011; in 1Q2012, Leighton Contractors’ 40.9% and BHP Billiton Iron Ore’s 35.1% alone were about 76%. Bases differ, but comparing 2012’s top two with 2025’s top three is conservative and still shows a large reduction. Concentration remains high, though materially below earlier listed history. Named FY2026 work in issuer updates includes BHP’s Port Debottlenecking Project 2 at Nelson Point, Iluka Resources’ Eneabba rare-earths refinery and Chevron Gorgon modules — a large-cap counterparty set.

The order book

Civmec’s usually quarterly order book is issuer-defined and unaudited. Bases vary: point values, “in excess of” floors and, from 4 June 2026, only Civmec’s alliance participating interest. These differences remain visible.

Order book series, March 2018 to June 2026
Chart notes.

The FY2026 results add a fourth basis: “as at 31 July 2026”, not 30 June 2026, for which no point value is published. FY2025 likewise used 31 July 2025. Thus three inconsistencies affect the series: points versus floors, alliance participation from 4 June 2026, and dates moving between 30 June and 31 July. Five observable pairs measure book-to-next-year revenue:

Order book at 30 JuneBook (A$m)Following yearRevenue (A$m)Revenue ÷ opening book
FY2020900FY2021674.20.75x
FY20211,006FY2022809.30.80x
FY20221,039FY2023830.90.80x
FY2024853FY2025810.60.95x
FY2025 (at 31 Jul 2025)1,250FY2026903.00.72x

FY2023 is excluded: no 30 June 2023 point value, only “in excess of A$1 billion”. FY2025 uses 31 July 2025, with no 30 June 2025 value; its extra month of awards is labelled, not adjusted. Conversion spans 0.72x–0.95x across five pairs. The sole issuer conversion statement, at FY2020 results, expected “over half” of 30 June 2020’s A$900m in FY2021. No equivalent accompanies A$1.4bn, only “visibility into FY27 and FY28”.

Half-year revenue, 1H FY2021 to 1H FY2026
Chart notes.

The 15 May 2026 Q3 FY2026 update reported A$244.2m quarterly revenue; nine-month revenue A$624.7m, EBITDA A$73.8m (11.8%), NPAT A$34.9m (5.6%) and EPS 6.86 Australian cents. Full-year subtraction implies record Q4 revenue A$278.3m and profit A$17.2m, a 6.2% net margin versus 5.6% for nine months. Both Q4 figures are derived; no full-year quarterly disclosure exists.

The programmes the company has named, and how their dates have moved

Initiatives from issuer filings: first-announced and latest-restated dates, all differing published figures retained. Execution risk is the author’s assessment, with its basis in each cell.

InitiativeTimeline, as announced and as restatedTarget givenStatus and last filed milestoneExecution risk
SEA1180 Arafura-class offshore patrol vesselsTwelve vessels at award. Restated to six in FY2024. The updated National Defence Strategy of 16 April 2026 re-committed to all six and added A$1.0–1.5bn over ten years, primarily for sustainment.No target published by the issuer. Civmec states a A$25bn funding envelope for the Henderson Defence Precinct, its characterisation of a government document not held in the pack.Defence issued a suspension-of-payment letter on 21 March 2024 over late support-system delivery. A Project of Concern summit followed on 4 May 2026; Defence and Civmec Defence Industries had implemented a remediation plan and achieved OPV 1–3 milestones, with remaining challenges requiring sustained momentum.High. The prime contract carries step-in rights, payment suspension, liquidated damages and termination remedies, and the programme has already been halved and placed under formal Defence oversight.
Civmec Defence Industries (Luerssen Australia)Acquired 1 July 2025; renamed Civmec Defence Industries during 1H FY2026. No date has moved.None given. The acquired contract liability of A$22.195m was not released at all in FY2026; the interim statements’ stated four-year straight-line policy was not applied and the release pattern is now “to be assessed”.A$20.0m cash for 100% of the shares, A$17.5m net of a A$2.5m contribution from the Commonwealth recovered claim. Identifiable net assets equalled the net consideration, so no goodwill arose.Medium. It makes Civmec prime on SEA1180, so its risk is that programme's risk. Acquired receivables of A$128.3m and payables of A$128.3m are exactly equal, which is worth watching as the balances unwind.
Perth Park allianceAwarded through Main Roads Western Australia for the state's entertainment and sporting precinct. No restatement disclosed.None. Civmec recognises only its portion of the participating interest in the alliance within the order book, so the headline order book understates the contract's gross value.Delivered by an alliance of Civmec, Seymour Whyte and Aurecon. The Western Australian Parliament tabled an interim report on 18 June 2026 raising process and probity concerns about the procurement.Medium. An alliance model shares risk but also dilutes control, and public procurement scrutiny can alter scope, certification and schedule.
Henderson assembly hall and siteSite extended by approximately seven hectares under a 2016 LandCorp lease for A$26.5m total consideration. Hall completed 2020.80,000 tonnes of steel a year of stated throughput capacity at Henderson, against 25,000 at Newcastle.The hall's size has been published four different ways: 29,000m² and a 53,470m² gross floor area in the same 26 April 2017 release, 53,000m² usable at the 2019 high-bay milestone, and 70,000m² usable in the FY2025 Annual Report — nine printed pages before the same report says 53,000m². Only the 2019 figure names its basis.Low for delivery, but the disclosure is unreliable. The asset plainly exists and operates; the issuer has never reconciled its own published measurements, so no single area figure should be quoted from it.

What the balance sheet is made of

Freehold land and buildings are revalued through other comprehensive income, never profit:

Total equity split between the asset revaluation reserve and the remainder
Chart notes.

ROE and price-to-book denominators therefore include growing capital the operating business neither earned nor deployed:

Return on average equity on two bases
Chart notes.

At 30 June 2026, cash fell to A$54.6m from A$102.9m; borrowings held at A$60.0m; leases rose to A$66.4m from A$60.5m. Lease-adjusted net debt rose A$54.2m to A$71.7m from A$17.6m: 0.67x derived EBITDA versus 0.19x. Total-finance-cost EBITDA cover improved to 11.4x from 9.5x. Leverage remains low, but rose.

FY2026 replaced the A$86m corporate-loan limit and A$2m quarterly step-down with one A$160m revolving multi-option facility (FY2025: A$156m) for loans, letters of credit and guarantees. Utilisation was 39.0% at 30 June 2026 (40.5% previously), leaving roughly A$97.6m; rates were 4.49%–5.34% (4.98%–5.55%). A general security deed covers certain property, plant and equipment and investment properties. The issuer says all financial covenants (leverage, tangible net worth and debt-service cover) were met at 30 June 2026, but definitions, thresholds and numerical headroom remain unpublished. Expiry is 31 January 2028, with possible bank extension. Draw conditions, minimum operating cash and secured-cash accessibility remain incompletely disclosed. The shared borrowing/bonding limit makes unused limit different from spare cash capacity.

Shares rose 1.7% over six years, from 500,985,000 at FY2020 to 509,625,000 at FY2026, entirely through performance rights (1,097,000 in FY2026). No Australian-dollar-era placements or rights issues.

Cash conversion

Operating cash flow, profit to owners and cash capex by financial year
Chart notes.

FY2019–FY2026 cumulative operating cash flow was A$438.5m versus A$325.9m profit to owners: 1.35x, down from FY2019–FY2025’s 1.69x. Cash capex totalled A$222.1m, including A$138.3m in FY2019 and FY2020’s facility build-out. FY2026 capex A$5.4m was 0.23x depreciation A$23.7m, the second year at roughly a fifth.

What the FY2026 outflow is made of

The media release gives A$107.2m “operating cash flow before working capital movements”, up 20.0%, omitting statutory cash flow. Both are true, A$130m apart. The issuer’s FY2026 cash-flow statement reconciles them:

FY2026 operating cash flow, A$’000Amount
Operating cash flow before working capital changes107,158
… trade and other receivables(159,330)
… contract assets(122,699)
… other current assets(642)
… trade and other payables131,814
… contract liabilities31,370
… provisions4,174
Working capital absorbed(115,313)
Cash used in operations(8,155)
Interest received1,815
Finance cost paid(7,890)
Income tax refund6,861
Income tax paid(15,748)
Net cash used in operating activities(23,117)

The same document’s Listing Rule Appendix 7.2 does disclose “Operating cash flow was an outflow of A$23.1 million for FY2026”. Neither the media release nor investor-presentation highlights does; both use A$107.2m before working capital.

Only one of the three components of A$115.3m represents trading deterioration:

Cash did not cover dividends. Free cash flow before dividends was negative A$28.0m (statutory CFO less A$5.4m capex plus A$0.6m disposals) against A$30.6m dividends paid. Opening cash and the acquisition’s one-off A$16.5m net inflow funded the gap; that inflow is not recurring FCF. Cash fell A$48.3m and closing borrowings held at A$60.0m, masking A$132.8m drawn and A$132.3m repaid on the revolver.

One year of negative operating cash flow in a contractor growing second-half revenue 70% is what growth funding looks like; eight-year operating cash of A$438m shows it is not, on this evidence, a cash-quality failure. But FY2026’s profit increase did not become cash, and conversion now requires collecting receivables and contract assets up A$307.6m in twelve months. First observable test: 1H FY2027, due around February 2027.

Where the cash went, FY2021–FY2026

Cash capex has been 0.6% of revenue for two years while PPE rises; its freehold land and buildings are carried at valuation. FY2026 condensed note 10 puts revalued freehold land/buildings at A$453.8m versus historical-cost net book value A$201.0m: A$252.8m excess, 55.7% of the carrying amount (30 June 2025 on the same basis: A$414.0m versus A$205.9m, excess A$208.1m, 50.3% of the carrying amount). FY2026 gross revaluation A$54.8m dwarfed A$5.4m cash spent. Committed capex, the only forward capex disclosure, remains near zero; none is disclosed before FY2024. Correction, 27 August 2026: the earlier 30 June 2025 excess, A$254.9m / 55.3%, could not be reproduced from the note’s columns. Both years now use FY2026 note 10’s basis.

A$mFY2021FY2022FY2023FY2024FY2025FY2026
Revenue674.2809.3830.91,033.5810.6903.0
Operating cash flow58.31.895.271.460.9(23.1)
Purchase of property, plant and equipment21.66.919.925.24.85.4
… as a share of revenue3.2%0.9%2.4%2.4%0.6%0.6%
Dividends paid in the year10.010.020.227.930.530.6
Property, plant and equipment at year end412.0448.1476.3532.8568.2619.6
Capital commitments contracted, not provided forn/an/an/a4.70.31.8

Independent credit view — agency-style analytical framework

SMID Research’s independent, unsolicited public credit analysis uses public information. It is not an S&P Global Ratings, Moody’s or other agency rating and copies no proprietary grids, weights, mapping or thresholds. Regional-bank research informs brevity and issue framing; no third-party Issuer Profile construct is used. Letter-grade debate and the scenario migration register sit only in the authenticated private vault.

Public credit conclusion, restated on the FY2026 accounts. Lease-adjusted leverage remains low at 0.67x derived EBITDA and finance-cost coverage improved to 11.4x, so debt-service capacity is not in question on these figures. Three things moved against the issuer in FY2026, all new since the last version of this section: operating cash flow was an outflow of A$23.1m, lease-adjusted net debt rose from A$17.6m to A$71.7m, and surety-bond utilisation rose from 45.9% to 67.7% of its limit. The prior constraints all stand: modest scale, Resources and customer concentration, fixed-price and cost-to-complete risk, lumpy working capital, contingent performance bonding, and incomplete disclosure of facility maturity, covenant and cash-accessibility terms.

Blue team and red team

Review lensConclusionWhat carries the most weight
Blue team — S&P-style lensFinancial capacity is stronger than the overall business-risk view.Net leverage still only 0.67x EBITDA, finance-cost cover improved to 11.4x, A$97.6m of unused facility limit, covenants stated as met, EBITDA up 17.0%, and a A$1.4bn order book.
Red team — Moody’s-style challengeThe present public evidence does not support a formal grade.FY2026 turned cash flow negative, tripled net debt and took surety utilisation to 67.7%; cash accessibility, facility maturity and covenant thresholds remain unpublished; contract assets at 112 days and the auditors’ key audit matters on construction-contract accounting and on the recoverability of receivables and contract assets deserve more weight than the leverage ratio.
Resolved house treatmentPublish the factual credit analysis and neutral watchpoints; keep the letter-grade range private.No instrument or recovery view without executed ranking, security and guarantee documents.

Lease-adjusted credit ratios

A$ million / xFY2024FY20251H FY2026 / Dec-25FY2026
EBITDA120.891.746.0107.3
Adjusted gross debt — borrowings plus leases121.3120.5124.5126.4
Adjusted net debt — less cash32.817.636.971.7
Gross debt / EBITDA1.00x1.31x1.35x annualised1.18x
Net debt / EBITDA0.27x0.19x0.40x annualised0.67x
EBITDA / total finance cost12.60x9.47x10.30x11.36x
Statutory CFO71.460.9(10.3)(23.1)
FCF before dividends46.156.1(11.3)(28.0)

Borrowings-only net debt was A$5.4m at 30 June 2026 (cash A$54.6m; drawn A$60.0m), versus A$42.9m net cash a year earlier. Adding A$66.4m leases gives the consistent creditor measure, A$71.7m. Its A$54.2m deterioration comprises A$48.3m cash decline and A$5.9m lease increases from remeasurement/additions. Derived total-finance-cost EBITDA matches the issuer’s A$107.3m.

Cash waterfall — cash quality matters more than the EBITDA line

A$ millionFY20251H FY2026FY2026
EBITDA91.746.0107.3
Operating cash before working capital89.344.9107.2
Working-capital movement+8.5(53.0)(115.3)
Net interest and tax cash items(36.9)(2.2)(15.0)
Statutory CFO60.9(10.3)(23.1)
Cash capex(4.8)(1.1)(5.4)
FCF before dividends56.1(11.3)(28.0)
Dividends(30.5)(17.8)(30.6)
Post-dividend FCF25.6(29.2)(58.5)

FY2025’s results-release “operating cash flow” of A$97.8m was before interest/tax; statutory CFO was A$60.9m. About A$53.0m working-capital absorption cut 1H FY2026 cash despite the A$16.5m acquisition inflow. Full-year absorption A$115.3m more than doubled the outflow to A$23.1m: another A$12.8m consumed in 2H. Acquired cash is not recurring FCF: it came with A$22.2m contract liabilities and A$128.3m each of Commonwealth-to-vendor pass-through receivables/payables. The implied A$5.5m annual liability release did not occur: FY2026 note 13 leaves A$22.195m unchanged. Earnings need no adjustment; future credit timing remains unstated.

Liquidity, bonding and claims-quality lens

Neutral credit watchpoints

The prior weakening test triggered: “negative operating cash flow persists alongside rising contract assets or receivables”. FY2026 CFO was negative; contract assets rose A$122.7m and receivables A$184.9m. The test is recorded as met, unchanged. Persistence remains unproven: this was the first full-year outflow, second-half revenue grew 69.8%, and acquired pass-through balances inflate receivables and payables.

Evidence strengthens if receivables/contract assets convert in 1H FY2027, rolling post-working-capital CFO turns positive and covers reinvestment/dividends, underlying margins hold as the acquired contract liability is eventually released, customer concentration falls, and facility/surety limits extend ahead of book growth. It weakens with a second negative-CFO period and rising contract assets, surety use approaching an unchanged limit, material onerous-contract/bond calls, or covenant/facility constraints. Covenants were stated met at 30 June 2026; unpublished thresholds prevent headroom tests either way.

The extended workbook, private shadow band, scenario migration analysis and blue/red-team disposition are available only in the authenticated Civmec vault. Public credit evidence is sourced to the FY2026 audited report of the directors and financial statements and FY2026 condensed statements of 27 August 2026, the FY2025 audited statements, 1H FY2026 interim statements, Q3 FY2026 update and 4 June 2026 order-book announcement.

The share price and what came with its moves

Over the window Civmec returned +141.9% on a dividend-adjusted basis; the S&P/ASX 200 returned n/a and the median of the 3 listed comparisons +241.8%.

3Q2023: +1.1% against the index's −1.0%3Q20234Q2023: +5.8% against the index's +7.7%4Q2023+5.8%1Q2024: −3.6% against the index's +4.0%1Q2024−3.6%2Q2024: +3.3% against the index's −1.6%2Q2024+3.3%3Q2024: +25.1% against the index's +6.5%3Q2024+25.1%4Q2024: +12.5% against the index's −1.3%4Q2024+12.5%1Q2025: −26.6% against the index's −3.9%1Q2025−26.6%2Q2025: +21.3% against the index's +8.9%2Q2025+21.3%3Q2025: +26.1% against the index's +3.6%3Q2025+26.1%4Q2025: +6.9% against the index's −1.5%4Q2025+6.9%1Q2026: −0.4% against the index's −2.7%1Q2026−0.4%2Q2026: +36.4% against the index's +3.5%2Q2026+36.4%3Q2026: −1.0% against the index's +3.5%3Q2026−1.0%RangeRe-ratingDrawdown, then recovery0.81.01.21.41.61.82.029 Aug 2023: FY2023: revenue rose 2.7% to A$830.9m; NPAT rose 13.7% to a record A$57.7m; final dividend 3.0 cents from 2.0.27 Oct 2023: Domicile proposal: agreement for a new Australian parent replacing Singapore via a 1-for-1 share exchange, targeted for June 2024.30 Oct 2023: Q1 FY24: revenue rose 7.3% to A$245.1m; NPAT rose 7.3% to A$15.2m; order book A$1.1bn, up 17.9%.15 Feb 2024: 1H FY24: revenue rose 17.5% to A$492.3m; NPAT rose 12.8% to A$31.9m; interim dividend 2.5 cents from 2.0.10 May 2024: Q3 FY24: revenue rose 37.6% to A$258.3m; NPAT rose 16.9% to A$17.1m; order book down to about A$821m after Navy OPV requirement cut from 12 to six.2 Jul 2024: Approximately A$174m of contracts/extensions, led by a new Dalrymple Bay Terminal shiploader.24 Jul 2024: LAND8710 Phase 2: Austal MOU to form a JV tendering for the Army's Landing Craft Heavy programme.2 Aug 2024: Scheme meeting: domicile resolution passed with 99.91% of shares voted in favour (299,041,436 for, 254,864 against).30 Aug 2024: FY2024: revenue rose 24.4% to A$1,033.5m; NPAT rose 11.6% to A$64.4m; final dividend 3.5 cents, total 6.0 cents; order book fell 17.9% to A$853.4m.5 Sep 2024: Domicile change effective 4 September 2024: Civmec Limited (Australia) replaces Singapore parent; ASX quotation reinstated 5 September after three-session suspension.15 Oct 2024: Luerssen Australia: non-binding NVL heads of agreement to transfer 100% of SEA1180 Offshore Patrol Vessel prime contractor to Civmec.29 Oct 2024: Q1 FY25: revenue rose 7.2% to A$262.7m; NPAT flat at A$15.2m; order book over A$800m; all three independent directors to retire at AGM.14 Nov 2024: A$90-100m shiploader award; FY25 outlook: delayed key awards expected to lower Q3 FY25 activity, potentially Q4 FY25 too.13 Jan 2025: Luerssen Australia: transfer revised to on or before 1 July 2025; service-level agreement allows Civmec to start OPV shipbuilding on a do-and-charge basis.14 Feb 2025: 1H FY25: revenue rose 2.2% to A$502.9m; NPAT fell 16.9% to A$26.5m; order book A$633m against A$1,002m a year earlier.6 May 2025: Approximately A$285m bolsters order book: Port Waratah shiploader, Iluka Eneabba tanks/civils, over A$40m maintenance.9 May 2025: Q3 FY25: revenue A$158.5m; NPAT A$8.0m; order book over A$760m, up a net A$127m in the quarter.26 Jun 2025: Binding agreement: 100% of Luerssen Australia for A$20m cash from existing reserves; completion targeted for 1 July 2025.2 Jul 2025: Luerssen Australia acquisition completed 1 July 2025; business becomes Civmec Defence Industries.23 Jul 2025: Order book strengthened by over A$600m, including remaining SEA1180 work after Luerssen acquisition.28 Aug 2025: FY2025: revenue fell 21.6% to A$810.6m; NPAT fell 34.0% to A$42.5m; dividend held at 6.0 cents; order book over A$1.25bn at 31 July 2025 from A$0.6bn in January.30 Oct 2025: Q1 FY26: revenue A$190.4m; NPAT A$10.5m (5.5% margin); order book over A$1.15bn at 30 September 2025.5 Jan 2026: Awards exceeding A$400m for delivery across 2H FY26/FY27, led by BHP Port Debottlenecking Project 2 civils at Nelson Point.13 Feb 2026: 1H FY26: revenue fell 24.3% to A$380.4m; NPAT fell 19.0% to A$21.4m; EBITDA margin 12%; order book over A$1.35bn at 31 December 2025.15 May 2026: Q3 FY26: revenue A$244.2m; NPAT A$13.5m; order book A$1.3bn against A$760m a year earlier; COO Kevin Deery retires from board.5 Jun 2026: Record A$1.5bn order book: new awards for delivery across FY27 and FY28 include Iluka Eneabba SMPE&I and Perth Park construction.9101113141518192224A$2.00 · 17 Jun 26A$0.83 · 7 Apr 25
Chart notes.

Key: Civmec (CVL) as a solid line; S&P/ASX 200 rebased, dashed; peer median rebased, dotted; the peer median runs off scale from Nov 25 and is clipped there; filing ticks above the axis; ex-dividend ticks on it; numbered pins are moves with a written note; plain dots are other detected moves.

Key moves

The five largest moves over a day or up to two weeks, with no day counted twice.

Each move is shown next to the market over the same days (and peers, where shown). News listed with a move was published within its dates; that does not mean the news caused the move. The quarter view has all the news.

Index: S&P/ASX 200. Peers: the median of three listed companies used as a sector check; the notes name them and their limits.

3Q2023

22 Aug 2023 – 29 Sep 2023 (part quarter)
CVL +1.1%ASX 200 −1.0%Peer median +6.7%Range A$0.88–A$0.95Close A$0.94

Key developments

  1. 29 Aug 2023 · A$0.92 · FY2023: revenue rose 2.7% to A$830.9m; NPAT rose 13.7% to a record A$57.7m; final dividend 3.0 cents from 2.0.

    EBITDA rose 15.4% to A$109.1m; net margin reached 6.9% from 6.3%. Resources revenue rose 7.6% to A$678.6m, gross margin to 13.2% from 11.3%; Energy rose 42.3% to A$43.0m; Infrastructure, Marine & Defence fell 26.2% to A$109.3m on revenue-recognition timing. Cash generated from operations: A$122.8m (113% of EBITDA); borrowings: A$56.5m from A$74.0m; net cash: A$13.9m from net borrowings of A$33.2m. Order book: A$1,149m at 30 June 2023, up 10.6%. Total annual dividends: 5.0 cents against 3.0 cents.

    Guidance: Company: the A$1.15bn order book secures most planned revenue for the next 12 months, partly extending to 2029; labour remained constrained; Navy surface-fleet analysis expected by end-2023.Same session: CVL −1.1% · ASX 200 +0.7% · peers +0.7%

4Q2023

2 Oct 2023 – 29 Dec 2023
CVL +5.8%ASX 200 +7.7%Peer median +5.0%Range A$0.89–A$1.03Close A$0.96

Key developments

  1. 27 Oct 2023 · A$0.93 · Domicile proposal: agreement for a new Australian parent replacing Singapore via a 1-for-1 share exchange, targeted for June 2024.

    Civmec Australia Limited, incorporated 26 October 2023, would become holding company via a Singapore scheme, taking the SGX and ASX listings. The company's three reasons: all of its 3,400-plus employees and facilities are in Australia; Singapore incorporation may limit increasingly applied Australian client/government local-content criteria, including continuous naval shipbuilding after the 2023 Defence Strategic Review; Australian parentage was expected to improve ASX capital access. Stated market capitalisation: about A$472m. Board unanimously recommended the scheme. Lodged after close; not flagged price sensitive.

    Next session (30 Oct): CVL +3.8% · ASX 200 −0.8% · peers −1.2%
  2. 30 Oct 2023 · A$0.96 · Q1 FY24: revenue rose 7.3% to A$245.1m; NPAT rose 7.3% to A$15.2m; order book A$1.1bn, up 17.9%.

    EBITDA rose 9.1% to A$28.9m; earnings per share reached 3.01 cents from 2.82. Cash generated from operations: A$40.1m (139% of EBITDA); quarter-end net cash: A$43.9m. Order book: A$1,102m at 30 September 2023. Port Hedland maintenance facility under construction; Gladstone development application lodged. New term agreements included three-year Albemarle lithium maintenance contract and Fortescue inspection agreement. Lodged after Australian close.

    Next session (31 Oct): CVL +3.6% · ASX 200 +0.1% · peers −1.6%
  3. 29 Nov 2023 · A$1.00 · Ex-dividend: FY2023 final, 3.0 Australian cents per share.

    Record 30 November 2023; paid 14 December 2023; AGM approval 31 October 2023. Chart returns adjust for it, excluding the ex-date step as a move.

Large price moves

  • 124 Oct 2023 · +8% · index 0% · peers +1%
  • 220 Nov 2023 · −7% · index 0% · peers 0%
  • 323 Nov 2023 · +8% · index −1% · peers 0%

1Q2024

2 Jan 2024 – 28 Mar 2024
CVL −3.6%ASX 200 +4.0%Peer median +0.6%Range A$0.87–A$0.94Close A$0.91

Key developments

  1. 15 Feb 2024 · A$0.92 · 1H FY24: revenue rose 17.5% to A$492.3m; NPAT rose 12.8% to A$31.9m; interim dividend 2.5 cents from 2.0.

    EBITDA rose 12.6% to A$59.6m; EBITDA margin slipped to 12.1% from 12.6%, net margin to 6.5% from 6.7%. Cash generated from operations rose 32.2% to A$111.2m; net cash reached A$83.1m from A$12.8m a year earlier. Order book: A$1,002m at 31 December 2023 against A$1,102m at 30 October. Port Hedland facility structure and Iron Bridge construction complete; first Main Roads WA road contract secured. Company: redomicile work with both countries' regulators continued ahead of a shareholder vote.

    Same session: CVL −1.6% · ASX 200 +0.8% · peers −0.7%
  2. 26 Mar 2024 · A$0.93 · Ex-dividend: 1H FY24 interim, 2.5 Australian cents per share.

    Record 27 March 2024; paid 15 April 2024.

2Q2024

2 Apr 2024 – 28 Jun 2024
CVL +3.3%ASX 200 −1.6%Peer median +5.5%Range A$0.88–A$0.97Close A$0.94

Key developments

  1. 10 May 2024 · A$0.91 · Q3 FY24: revenue rose 37.6% to A$258.3m; NPAT rose 16.9% to A$17.1m; order book down to about A$821m after Navy OPV requirement cut from 12 to six.

    EBITDA rose 15.2% to A$31.6m; EBITDA margin fell to 12.2% from 14.6%. Nine-month revenue: A$750.7m, up 23.7%; NPAT: A$49.0m, up 14.2%; net cash: A$35.9m. Company: supply scope for six Offshore Patrol Vessels complete, shipbuilding workforce redeployed to other contracts, reduced OPV count would not materially affect FY24 revenue/profit. New work included Pilbara Minerals' P1000 expansion and Chevron Gorgon CCS modules; priced opportunities approaching A$10bn. Order book fell from A$1,002m at 31 December 2023.

    Same session: CVL +3.4% · ASX 200 +0.4% · peers +0.7%

3Q2024

1 Jul 2024 – 30 Sep 2024
CVL +25.1%ASX 200 +6.5%Peer median +8.9%Range A$0.95–A$1.29Close A$1.17

Key developments

  1. 2 Jul 2024 · A$0.95 · Approximately A$174m of contracts/extensions, led by a new Dalrymple Bay Terminal shiploader.

    Shiploader to be manufactured/assembled offsite at Henderson and shipped by heavy-lift vessel. Balance: maintenance under existing term contracts (shiploader bogie changeout, wharf remediation, inspections, shutdowns) and additional existing manufacturing/construction scopes. Company said Gladstone east-coast maintenance-hub plans were progressing.

    Same session: CVL +0.0% · ASX 200 −0.4% · peers −0.2%
  2. 24 Jul 2024 · A$1.18 · LAND8710 Phase 2: Austal MOU to form a JV tendering for the Army's Landing Craft Heavy programme.

    Intended JV would contract directly with the Commonwealth and build in Civmec's Henderson assembly hall. Company: details remained unresolved, including expanding Henderson's footprint to avoid affecting resources, energy and infrastructure work. Not flagged price sensitive.

    Same session: CVL +4.4% · ASX 200 −0.1% · peers +0.7%
  3. 2 Aug 2024 · A$1.26 · Scheme meeting: domicile resolution passed with 99.91% of shares voted in favour (299,041,436 for, 254,864 against).

    Of 84 shareholders voting in person/by proxy on 1 August 2024, 79 backed it. Companion EGM resolutions passed; Singapore High Court approval still required.

    Same session: CVL +1.6% · ASX 200 −2.1% · peers −2.7%
  4. 7 Aug 2024 · A$1.12 · Scheme approval hearing re-fixed to 28 August 2024 from 3 September 2024.

    Procedural update lodged during session; not flagged price sensitive. The 6 August announcement set 3 September.

  5. 30 Aug 2024 · A$1.15 · FY2024: revenue rose 24.4% to A$1,033.5m; NPAT rose 11.6% to A$64.4m; final dividend 3.5 cents, total 6.0 cents; order book fell 17.9% to A$853.4m.

    EBITDA rose 10.7% to A$120.8m. Resources revenue rose 29.2% to A$876.5m, Infrastructure, Marine & Defence 15.2% to A$126.0m; Energy fell 27.7% to A$31.0m. Gross profit rose 9.0% to A$119.0m, but second-half A$58.7m was 2.6% below first-half on 9.9% higher revenue. Cash generated from operations fell 21.1% to A$96.9m (80% of EBITDA) on contract-asset conversion timing; capex: A$25.2m; borrowings rose to A$64.0m; net cash: A$24.5m. Order-book decline attributed to major resources-award timing. Bojan Cica appointed CFO from 1 September 2024, succeeding acting CFO/COO Kevin Deery. Final dividend conditional on completion of the scheme sanctioned by the court on 28 August.

    Guidance: No forecast. Company: tendering targeted given labour constraints; Australian OEM materials-handling demand exceeded 30 machines over ten years; LAND8710 JV opened potential participation in over A$25bn of future work.Same session: CVL +5.0% · ASX 200 +0.6% · peers +1.1%
  6. 5 Sep 2024 · A$1.20 · Domicile change effective 4 September 2024: Civmec Limited (Australia) replaces Singapore parent; ASX quotation reinstated 5 September after three-session suspension.

    Court order lodged with ACRA on 4 September 2024. Existing directors joined NewCo's board; three incorporation directors resigned. ASX CDIs last traded 30 August 2024; suspension lodged 7:00pm that day. New shares reinstated 9:09am on 5 September, initially with deferred settlement; normal settlement from 11 September. ASX becomes primary venue; previously CVL.AX was a Foreign Exempt CDI line against SGX.

    Same session: CVL +4.4% · ASX 200 +0.4% · peers −0.6%

Large price moves

  • 419 Jul 2024 · +11% · index −1% · peers 0%
  • 5week to 19 Jul 2024 · +13% · index 0% · peers −1%
  • 68 Aug 2024 · −8% · index 0% · peers 0%
  • 79 Aug 2024 · +7% · index +1% · peers +1%
  • 8week to 9 Aug 2024 · −12% · index −2% · peers −3%

4Q2024

1 Oct 2024 – 31 Dec 2024
CVL +12.5%ASX 200 −1.3%Peer median +7.3%Range A$1.17–A$1.39Close A$1.28

Key developments

  1. 14 Oct 2024 · A$1.26 · Ex-dividend: FY2024 final, 3.5 Australian cents per share.

    Record 15 October 2024; paid 25 October 2024; payment had required domicile-change completion.

  2. 15 Oct 2024 · A$1.26 · Luerssen Australia: non-binding NVL heads of agreement to transfer 100% of SEA1180 Offshore Patrol Vessel prime contractor to Civmec.

    Sole business: six Arafura-class Royal Australian Navy OPVs, built at Osborne South and Civmec's Henderson facility. Transfer subject to Commonwealth consent, due diligence and conditions precedent; target 31 December 2024. Consideration unstated. Lodged after close.

    Next session (16 Oct): CVL +0.0% · ASX 200 −0.4% · peers −3.0%
  3. 29 Oct 2024 · A$1.34 · Q1 FY25: revenue rose 7.2% to A$262.7m; NPAT flat at A$15.2m; order book over A$800m; all three independent directors to retire at AGM.

    EBITDA rose 1.0% to A$29.2m; earnings per share: 2.99 cents. Order book at 30 September 2024: above A$800m against A$853m at 30 June. Awards: BHP car-dumper cells CD4/CD6, Tianqi Lithium panel, Orora glass-furnace refractory work; bridge accreditation raised to B4. Under SGX tenure rules, independent directors Chong Teck Sin, Wong Fook Choy Sunny and Douglas Owen Chester would retire 30 October 2024. Nominees Ong Beng Hong, Gary Gray and Ambrose Law were all elected at the next day's AGM. Lodged after close.

    Next session (30 Oct): CVL +2.6% · ASX 200 −0.8% · peers +0.7%
  4. 14 Nov 2024 · A$1.32 · A$90-100m shiploader award; FY25 outlook: delayed key awards expected to lower Q3 FY25 activity, potentially Q4 FY25 too.

    Western Australian port design-and-construct shiploader, handover due 2028, described as not material for ASX purposes. Company: historically high tendering, but key awards slipped from H1 FY25 to H2 FY25; order book remained above A$800m. First statement in the window of falling activity.

    Guidance: Delayed key awards to lower Q3 FY25 activity, potentially Q4 FY25 too.Same session: CVL −1.5% · ASX 200 +0.4% · peers +0.4%

1Q2025

2 Jan 2025 – 31 Mar 2025
CVL −26.6%ASX 200 −3.9%Peer median +7.8%Range A$0.91–A$1.35Close A$0.92

Key developments

  1. 13 Jan 2025 · A$1.31 · Luerssen Australia: transfer revised to on or before 1 July 2025; service-level agreement allows Civmec to start OPV shipbuilding on a do-and-charge basis.

    Due diligence described as positive; parties working with Commonwealth on consent. Civmec Construction & Engineering–Luerssen Australia service-level agreement runs until ownership transfer or term-end.

    Same session: CVL −0.8% · ASX 200 −1.2% · peers −2.1%
  2. 14 Feb 2025 · A$1.06 · 1H FY25: revenue rose 2.2% to A$502.9m; NPAT fell 16.9% to A$26.5m; order book A$633m against A$1,002m a year earlier.

    EBITDA fell 11.2% to A$52.9m, margin to 10.5% from 12.1%; gross profit fell 7.5% to A$55.8m (11.1% margin). Administrative expenses rose 18.3%, attributed by company to domicile-change company/consultant fees and stamp duty, plus support-cost reclassification. Cash generated from operations: A$0.7m against A$111.2m on key-project payment timing; debtors paid A$104.1m in January 2025. Operating activities used A$22.7m; cash fell to A$37.0m from A$88.5m, borrowings to A$60.0m from A$64.0m. Interim dividend held at 2.5 cents; priced opportunities nearly A$12bn.

    Guidance: Market-condition shift delaying key awards expected to lower 2H FY25 activity, potentially into 1H FY26; Luerssen transfer set for on or before 1 July 2025.Same session: CVL −13.1% · ASX 200 +0.2% · peers +0.6%
  3. 25 Mar 2025 · A$0.92 · Ex-dividend: 1H FY25 interim, 2.5 Australian cents per share.

    Record 26 March 2025; paid 11 April 2025.

Large price moves

  • 914 Feb 2025 · −13% · index 0% · peers +1%
  • 10week to 14 Feb 2025 · −18% · index +1% · peers −2%

2Q2025

1 Apr 2025 – 30 Jun 2025
CVL +21.3%ASX 200 +8.9%Peer median +9.9%Range A$0.83–A$1.11Close A$1.11

Key developments

  1. 6 May 2025 · A$0.88 · Approximately A$285m bolsters order book: Port Waratah shiploader, Iluka Eneabba tanks/civils, over A$40m maintenance.

    Port Waratah shiploader: design, fabrication, preassembly, shipping and installation at Kooragang Terminal; handover due 2028; separate existing-shiploader refurbishment during 2025. Iluka: 30 field-erected tanks and more than 11,000 cubic metres of concrete at Eneabba rare-earths refinery; completion in 2026. Maintenance secured in Q3 FY25.

    Same session: CVL +2.9% · ASX 200 −0.1% · peers +1.8%
  2. 9 May 2025 · A$0.98 · Q3 FY25: revenue A$158.5m; NPAT A$8.0m; order book over A$760m, up a net A$127m in the quarter.

    Q3 EBITDA: A$19.2m, 12.1% margin; net margin: 5.1%. Nine-month revenue: A$661.3m; EBITDA: A$72.1m (10.9%); NPAT: A$34.6m (5.2%); earnings per share: 6.8 cents. Net assets: A$505.8m, 99.4 cents a share. Company: flagged delays materialised; 2H FY25 a transition after several major projects completed earlier that calendar year. Priced opportunities above A$13bn. Release provided no prior-year quarterly comparatives.

    Guidance: Q4 revenue/earnings consistent with Q3; reduced Q3/Q4 activity potentially continuing into 1H FY26.Same session: CVL +8.8% · ASX 200 +0.5% · peers +0.5%
  3. 26 Jun 2025 · A$1.10 · Binding agreement: 100% of Luerssen Australia for A$20m cash from existing reserves; completion targeted for 1 July 2025.

    Plant/equipment valued at A$3.6m without external valuation. NVL retains responsibility for liabilities, defects and claims up to the transfer date and keeps milestone payments earned before completion; pre-agreed working capital remains. NVL supports SEA1180 under a service-level agreement and non-compete. Conditions: Commonwealth change-of-control consent, licence/IP assignment, no material adverse change. Business to become Civmec Defence Industries; company said it would deliver five OPVs over the next 3.5 years. ASX confirmed Listing Rule Chapter 11 inapplicable.

    Same session: CVL +4.3% · ASX 200 −0.1% · peers −0.2%

Large price moves

  • 117 Apr 2025 · −7% · index −4% · peers −6%
  • 128 Apr 2025 · +6% · index +2% · peers +3%
  • 139 May 2025 · +9% · index +1% · peers +1%
  • 14week to 9 May 2025 · +16% · index 0% · peers +3%

3Q2025

1 Jul 2025 – 30 Sep 2025
CVL +26.1%ASX 200 +3.6%Peer median +30.5%Range A$1.12–A$1.48Close A$1.40

Key developments

  1. 2 Jul 2025 · A$1.18 · Luerssen Australia acquisition completed 1 July 2025; business becomes Civmec Defence Industries.

    Funded from existing cash. Workforce, engineering/training systems and supply chain transferred to support SEA1180 OPVs, with structured handover and NVL technical collaboration.

    Same session: CVL +4.9% · ASX 200 +0.7% · peers −1.0%
  2. 23 Jul 2025 · A$1.12 · Order book strengthened by over A$600m, including remaining SEA1180 work after Luerssen acquisition.

    Other awards: Rio Tinto Cape Lambert Port A high-density-ores upgrade of six balance machines, installation across eight shutdowns in 2026; Fortescue Christmas Creek Green Iron civils/SMPE&I; preferred-proponent status with Seymour Whyte/Aurecon for Perth Sporting and Entertainment Precinct planning/design, with only design recognised in order book. Lodged after close; reaction session 24 July.

    Next session (24 Jul): CVL +8.0% · ASX 200 −0.3% · peers +0.3%
  3. 28 Aug 2025 · A$1.16 · FY2025: revenue fell 21.6% to A$810.6m; NPAT fell 34.0% to A$42.5m; dividend held at 6.0 cents; order book over A$1.25bn at 31 July 2025 from A$0.6bn in January.

    EBITDA: A$91.7m, 11.3% margin. Gross margin steady at 11.5%; gross profit fell 21.9% to A$92.9m. Trough 2H revenue: A$307.7m, 38.8% below first half; 2H NPAT: A$16.0m. Resources revenue fell 26.8% to A$641.2m, gross profit 49.4% to A$48.9m; Energy more than doubled to A$65.2m. Infrastructure, Marine & Defence revenue fell 17.3% to A$104.2m, but gross profit doubled to A$35.9m on Boorloo Bridge completion profit. Administrative expenses rose 10% on listing fees/domicile-related tax consulting. Cash generated from operations: A$97.8m; capex: A$4.8m; cash: A$102.9m; borrowings: A$60.0m. Remaining SEA1180 work joined order book with Luerssen acquisition. Lodged after close.

    Guidance: Company still expected reduced 1H FY26 activity, lifting heading into 2H FY26; Luerssen acquisition expected to increase Infrastructure and Defence activity.Next session (29 Aug): CVL +3.4% · ASX 200 −0.1% · peers +0.8%

Large price moves

  • 1524 Jul 2025 · +8% · index 0% · peers 0%
  • 1615 Sep 2025 · +11% · index 0% · peers 0%

4Q2025

1 Oct 2025 – 31 Dec 2025
CVL +6.9%ASX 200 −1.5%Peer median +17.8%Range A$1.34–A$1.48Close A$1.46

Key developments

  1. 13 Oct 2025 · A$1.37 · Ex-dividend: FY2025 final, 3.5 Australian cents per share.

    Record 14 October 2025; paid 24 October 2025.

  2. 30 Oct 2025 · A$1.46 · Q1 FY26: revenue A$190.4m; NPAT A$10.5m (5.5% margin); order book over A$1.15bn at 30 September 2025.

    EBITDA: A$23.1m, 12.1% margin. Release lacked prior-year comparatives; Q1 FY25 reported A$262.7m revenue/A$15.2m NPAT. Luerssen Australia renamed Civmec Defence Industries 1 October 2025. Commonwealth accepted second OPV NUSHIP Eyre on 12 September; shipbuilding moved exclusively to Henderson; third-vessel launch due 31 October. Company: LAND8710 MOU Austal JV unlikely if programme built outside Civmec's Henderson facilities. Awards included CSBP sodium cyanide project, balance-machine upgrade to end-2027, Fortescue process water tank.

    Guidance: Previously expected 1H FY26 activity reduction materialising; uplift heading into 2H FY26 through early contractor involvement.Same session: CVL −1.4% · ASX 200 −0.5% · peers +1.7%

Large price moves

  • 1722 Oct 2025 · +7% · index −1% · peers −2%

1Q2026

2 Jan 2026 – 31 Mar 2026
CVL −0.4%ASX 200 −2.7%Peer median +4.4%Range A$1.43–A$1.75Close A$1.43

Key developments

  1. 5 Jan 2026 · A$1.59 · Awards exceeding A$400m for delivery across 2H FY26/FY27, led by BHP Port Debottlenecking Project 2 civils at Nelson Point.

    PDP2 covers earthworks, piling, dewatering and concrete for the sixth car dumper, also manufactured by Civmec at Henderson; follows a roughly 700-tonne structural-steel package for the same project. Fortescue awarded Eliwana/Flying Fish charger facilities and pit power infrastructure; further Port Hedland/Gladstone maintenance secured. Issuer document dated 2 January 2026; ASX lodgement pre-open 5 January.

    Same session: CVL +8.9% · ASX 200 +0.0% · peers +1.8%
  2. 13 Feb 2026 · A$1.56 · 1H FY26: revenue fell 24.3% to A$380.4m; NPAT fell 19.0% to A$21.4m; EBITDA margin 12%; order book over A$1.35bn at 31 December 2025.

    EBITDA: A$46m; net margin: 5.6% against 5.3%; earnings per share: 4.21 cents. Group gross profit: A$44.9m, 11.8% margin against 11.1%. Resources revenue fell to A$222.7m from A$406.9m; Energy rose to A$59.6m from A$28.1m; Infrastructure, Marine & Defence rose to A$98.1m from A$67.8m in the first half consolidating Civmec Defence Industries, a business combination with A$20.0m cash consideration. Cash: A$87.6m against A$102.9m at 30 June 2025; corporate market loan drawn: A$60.0m. Bank facilities consolidated into A$160m revolving multi-option facility, 39.2% utilised; all covenants met. Net assets: A$534.6m (A$1.05 a share). Interim dividend held at 2.5 cents, fully franked, payable 10 April 2026.

    Same session: CVL +0.3% · ASX 200 −1.4% · peers −0.9%
  3. 24 Mar 2026 · A$1.45 · Ex-dividend: 1H FY26 interim, 2.5 Australian cents per share, fully franked.

    Record 25 March 2026; paid 10 April 2026.

Large price moves

  • 185 Jan 2026 · +9% · index 0% · peers +2%
  • 19week to 9 Jan 2026 · +14% · index 0% · peers +2%
  • 206 Feb 2026 · −6% · index −2% · peers −4%
  • 2120 Feb 2026 · +6% · index 0% · peers −1%
  • 22week to 20 Feb 2026 · +11% · index +2% · peers +17%

2Q2026

1 Apr 2026 – 30 Jun 2026
CVL +36.4%ASX 200 +3.5%Peer median +41.2%Range A$1.41–A$2.00Close A$1.95

Key developments

  1. 15 May 2026 · A$1.65 · Q3 FY26: revenue A$244.2m; NPAT A$13.5m; order book A$1.3bn against A$760m a year earlier; COO Kevin Deery retires from board.

    Q3 EBITDA: A$27.8m. Nine-month revenue: A$624.7m; EBITDA: A$73.8m (11.8% margin); NPAT: A$34.9m (5.6%); earnings per share: 6.86 cents. Order book includes Main Roads WA Perth Park alliance award. Awards in the quarter included Chevron DE-PMP follow-on modules, Woodside Blakemere manifold, Yara 26 plant turnaround. Company: National Defence Strategy of 16 April 2026 re-committed to all six Arafura-class OPVs, added A$1.0-1.5bn over ten years mainly for sustainment, confirmed A$25bn Henderson Defence Precinct envelope. Kevin Deery retired as director/Chief Operating Officer after 17 years, remaining adviser; company called handover a completed multi-year succession.

    Same session: CVL +6.5% · ASX 200 −0.1% · peers +0.5%
  2. 5 Jun 2026 · A$1.76 · Record A$1.5bn order book: new awards for delivery across FY27 and FY28 include Iluka Eneabba SMPE&I and Perth Park construction.

    Iluka extends Eneabba rare-earths refinery scope from tanks/civils to plant-wide multidisciplinary installation, supporting commissioning from mid-2027. Civmec/Seymour Whyte/Aurecon alliance won Perth Park major construction, expected substantially complete late 2027. Only Civmec's participating interest recognised, already in 15 May order book. Further maintenance-panel extensions/orders secured in Port Hedland/Gladstone. Issuer document dated 4 June 2026.

    Same session: CVL +0.9% · ASX 200 −0.7% · peers −2.3%

Large price moves

  • 2329 Apr 2026 · +5% · index 0% · peers −1%
  • 2415 May 2026 · +7% · index 0% · peers +1%
  • 2516 Jun 2026 · +5% · index 0% · peers 0%

3Q2026

1 Jul 2026 – 21 Aug 2026 (part quarter)
CVL −1.0%ASX 200 +3.5%Peer median +3.9%Range A$1.70–A$1.93Close A$1.93

Large price moves

  • 261 Jul 2026 · −6% · index −1% · peers 0%
Notes and sources

Share price record

How this section was built

The detector flagged 26 large moves in the window — 20 single sessions and 6 weekly windows — before any news was read. 4 sector moves; 22 are left over after both controls, unexplained by them. Of those, 8 coincided with one in the same session or week and 14 have nothing filed against them beyond routine notices and are recorded as unexplained rather than explained away.

This section records the 36-month price history of the ASX line (CVL.AX, the primary listing since the change of domicile; the SGX line P9D trades the same company) and puts every large move through two subtractions and reports what is left over, not what caused it: first the S&P/ASX 200, then the median of three ASX-listed operating comparisons — Monadelphous, NRW Holdings and Southern Cross Electrical. “Left over” is what survives both controls, and it is the only column that can carry something the market and sector controls do not explain; it does not by itself say what caused the move.

Each quarter panel pairs two records. Key developments are the filings that carry information — results, quarterly updates, order-book and contract announcements, the change of domicile, the Luerssen acquisition, board and dividend events — with the figures as filed, the guidance given, the close on the day and how the reacting session traded against both controls; a filing lodged after the 10:00 open is read against the next session. Large price moves are the threshold-detected sessions from the price-driver register, each put through both controls.

How to read the tags. Market-wide and Sector-wide mean the index or the peer median moved with the share over the same session or week; Residual means the move is still large after both are subtracted. A residual is what is left over, not a cause: it does not establish that the company’s own news moved the price, and an unchanged or thinly traded price is not proof that no information arrived. Returns use the dividend-adjusted close; a filing released after the open is read against the next session.

Prices are a market-data vendor's daily series for CVL.AX (761 sessions from 22 August 2023 to 21 August 2026) on the dividend-adjusted close; the traded close is shown. Announcement dates, lodgement times and price-sensitivity flags are from the ASX company-announcement register for CVL, queried by year for 2023 to 2026 and cross-read against the issuer's announcement archive.

Limitations bound every row above. The announcement register enumerates the ASX company-announcement tape for CVL, queried by year for 2023 to 2026 and complete on that venue for 22 August 2023 to 21 August 2026, with the exchange lodgement time and price-sensitivity flag on every row; it was cross-read against the issuer's own announcement archive, which files releases under the document date rather than the lodgement date and omits exchange housekeeping. Civmec was SGX-primary with an ASX Foreign Exempt CDI line until the change of domicile took effect on 4 September 2024, so ASX rows before that date are re-lodgements of SGX releases, typically one calendar day later and often after the Australian close; the SGX release timestamps were not checked, and an SGX-only release with no ASX re-lodgement would not appear here. The acquired subsidiary Civmec Defence Industries (formerly Luerssen Australia) has no standalone filing stream, so only group disclosures and Commonwealth Defence programme releases are visible, and no channel beyond the exchange register and issuer archive was examined: broker research, substantial-holder crossing data and index-membership changes were not enumerated, which matters because six of the fourteen unexplained moves in the price-driver map fall on empty Civmec tape days at 4x to 22x median turnover. The sector control is three ASX peers (Monadelphous, NRW Holdings, Southern Cross Electrical); a three-name mean is moved by any single peer event, as on 15 June 2026 when SXE rose 19.9% on its own placement, so per-peer returns rather than the mean are used to decide a sector call.

A quarter shows only the columns it has. An empty developments column means: No filings beyond routine disclosures this quarter. An empty moves column means: No session cleared the large-move threshold this quarter.

The full move register — every large move and its market and sector controls

Chart notes.
#SessionCVLASX 200PeersLeft over Control resultWhat the evidence supports
124 Oct 2023+7.7%+0.2%+0.6%+7.1%ResidualNo announced cause identified. Civmec lodged no announcement on 23 or 24 October 2023; the ASX benchmark was +0.19% and the peer set +1.01% over the same session. Turnover was 17,941 shares, 0.26x the trailing median. Monadelphous +2.4 · NRW +0.0 · SCEE +0.6
220 Nov 2023−7.1%+0.1%−0.4%−6.7%ResidualNo announced cause identified. The nearest Civmec lodgements were the 2023 AGM minutes, a conversion of vested performance rights and an application for quotation of securities, all released after the close on 17 November 2023 and none flagged price sensitive. The benchmark returned +0.13% and the peer set -0.28% over the same window. The shares recovered to A$0.985 by 23 November 2023. Monadelphous +1.8 · NRW −0.4 · SCEE −2.2
323 Nov 2023+7.7%−0.6%+0.0%+7.7%ResidualNo announced cause identified. Civmec lodged no announcement between 17 November and 1 December 2023. The benchmark returned -0.62% and the peer set +0.04% over the same session, and turnover was 0.97x the trailing median. The close of A$0.985 returned the shares to within half a cent of the 17 November 2023 close. Monadelphous +0.7 · NRW +0.0 · SCEE −0.6
419 Jul 2024+10.9%−0.8%−0.2%+11.1%ResidualNo announced cause identified. Civmec lodged no announcement on 18 or 19 July 2024. The benchmark returned -0.81% and the peer set +1.02% over the same session. Turnover was 3.76x the trailing median. The Austal / Civmec LAND8710 Phase 2 memorandum of understanding was lodged five sessions later, on 24 July 2024, a session on which the shares closed 4.4% higher. Monadelphous −0.2 · NRW +4.1 · SCEE −0.9
5week to 19 Jul 2024+12.9%+0.1%−1.2%+14.0%ResidualNo announced cause identified. No Civmec announcement was lodged between 12 and 19 July 2024. The benchmark returned +0.15% and the peer set +0.82% over the same week. Monadelphous −2.1 · NRW +5.8 · SCEE −1.2
68 Aug 2024−7.6%−0.2%−0.2%−7.4%ResidualNo announced cause identified. The only Civmec lodgement in the window was a procedural update on the second court hearing date for the change-of-domicile scheme, released at 2:34pm on 7 August 2024 and not flagged price sensitive. The benchmark returned -0.23% and the peer set -0.75% over the same session. Monadelphous −0.2 · NRW +0.6 · SCEE −2.7
79 Aug 2024+6.7%+1.2%+1.3%+5.4%ResidualNo announced cause identified. Civmec lodged no announcement on 8 or 9 August 2024. The benchmark returned +1.25% and the peer set +2.04% over the same session, and turnover was 0.73x the trailing median. Monadelphous +0.8 · NRW +1.3 · SCEE +4.0
8week to 9 Aug 2024−11.9%−2.1%−3.2%−8.7%ResidualNo announced cause identified. The week covers the global volatility episode of 5 August 2024: the benchmark returned -2.08% and the peer set -3.54%, against -11.90% for the shares. The only Civmec lodgements in the window were change-of-domicile scheme procedural items, none flagged price sensitive. Monadelphous −3.2 · NRW −4.6 · SCEE −2.9
914 Feb 2025−13.1%+0.2%+0.6%−13.7%ResidualThe session coincided with the release of Civmec's 1H FY2025 results, lodged with ASX at 8:19am AEDT on 14 February 2025 and flagged price sensitive. The release disclosed an order book of A$633 million at 31 December 2024. The shares closed 13.1% lower on 22.68x the trailing median volume, against a benchmark return of +0.19% and a peer set return of -0.05%. Monadelphous +1.2 · NRW +0.6 · SCEE −2.0
10week to 14 Feb 2025−18.1%+0.5%−1.7%−16.4%ResidualThe week coincided with the release of Civmec's 1H FY2025 results on 14 February 2025. The shares fell 18.2% over the week against a benchmark return of +0.52% and a peer set return of -1.30%. Monadelphous +1.4 · NRW −1.7 · SCEE −3.5
117 Apr 2025−7.2%−4.2%−5.8%−1.5%Sector-wideThe shares tracked a broad market fall. The benchmark returned -4.23% and the three peers -6.50%, -5.77% and -3.34% over the same session. Civmec lodged no announcement between 7 March and 6 May 2025. The close of A$0.835 is the low of the 36-month window. Monadelphous −6.5 · NRW −5.8 · SCEE −3.3
128 Apr 2025+6.0%+2.3%+2.5%+3.5%Sector-wideThe shares tracked a broad market rebound. The benchmark returned +2.27% and the three peers +3.69%, +2.45% and +2.52% over the same session, against +5.99% for the shares. Turnover was 1.22x the trailing median and Civmec lodged no announcement in the period. Monadelphous +3.7 · NRW +2.4 · SCEE +2.5
139 May 2025+8.8%+0.5%+0.5%+8.3%ResidualThe session coincided with the release of Civmec's Q3 FY25 business update, lodged with ASX at 8:20am AEST on 9 May 2025 and flagged price sensitive. Three sessions earlier, on 6 May 2025, Civmec announced A$285 million of order-book additions. The shares closed 8.8% higher on 4.56x the trailing median volume, against a benchmark return of +0.48% and a peer set return of +0.37%. Monadelphous −0.1 · NRW +0.7 · SCEE +0.5
14week to 9 May 2025+15.9%−0.1%+2.7%+13.2%ResidualThe week coincided with two price-sensitive Civmec releases: A$285 million of order-book additions announced on 6 May 2025 and the Q3 FY25 business update on 9 May 2025. The shares rose 15.9% over the week against a benchmark return of -0.08% and a peer set return of +2.93%. Monadelphous +2.4 · NRW +3.7 · SCEE +2.7
1524 Jul 2025+8.0%−0.3%+0.3%+7.7%ResidualThe session coincided with Civmec's announcement that its order book had strengthened by over A$600 million, lodged with ASX at 7:26pm AEST on 23 July 2025 and flagged price sensitive. The shares closed 8.0% higher on 5.52x the trailing median volume, against a benchmark return of -0.32% and a peer set return of +0.36%. Monadelphous −0.9 · NRW +0.3 · SCEE +1.7
1615 Sep 2025+10.9%−0.1%+0.0%+10.9%ResidualNo announced cause identified. Civmec lodged no announcement between 28 August and 30 September 2025. The benchmark returned -0.13% and the peer set +1.19% over the same session, and turnover was 12.52x the trailing median. The close of A$1.475 was 27% above the A$1.16 close on the day the FY2025 results were released. Monadelphous +0.0 · NRW +0.0 · SCEE +3.6
1722 Oct 2025+7.2%−0.7%−1.8%+9.0%ResidualNo announced cause identified. The only Civmec lodgement on 22 October 2025 was the pre-AGM answers to shareholder questions, released at 6:59pm AEDT after the close of that session. The benchmark returned -0.71% and the peer set -1.77% over the same session, and turnover was 22.25x the trailing median. Monadelphous −1.8 · NRW −1.4 · SCEE −2.1
185 Jan 2026+8.9%+0.0%+1.8%+7.1%ResidualThe session coincided with Civmec's announcement of more than A$400 million of new contracts and extensions, lodged with ASX at 9:12am AEDT on 5 January 2026 and flagged price sensitive. The underlying issuer document is dated 2 January 2026. The shares closed 8.9% higher on 17.24x the trailing median volume, against a benchmark return of +0.01% and a peer set return of +1.24%. Monadelphous +1.8 · NRW +2.4 · SCEE −0.4
19week to 9 Jan 2026+14.0%−0.1%+2.3%+11.7%ResidualThe week coincided with Civmec's announcement of more than A$400 million of new contracts and extensions on 5 January 2026. The shares rose 14.0% over the week against a benchmark return of -0.11% and a peer set return of +0.75%. Monadelphous +2.3 · NRW +3.1 · SCEE −3.2
206 Feb 2026−6.2%−2.0%−3.9%−2.3%Sector-wideThe shares tracked a falling market and sector. The benchmark returned -2.03% and the three peers -3.85%, -4.58% and -2.60% over the same session, against -6.15% for the shares. Civmec lodged no announcement between 5 January and 13 February 2026. Monadelphous −3.9 · NRW −4.6 · SCEE −2.6
2120 Feb 2026+6.4%−0.1%−0.7%+7.2%ResidualNo announced cause identified. Civmec lodged no announcement between 13 February and 15 May 2026. Over the same session the benchmark returned -0.05% and the three peers +3.43%, -0.75% and -1.45%. Turnover was 14.63x the trailing median. The week containing this session is recorded separately as MV022. Monadelphous −0.7 · NRW +3.4 · SCEE −1.4
22week to 20 Feb 2026+11.2%+1.8%+16.8%−5.6%Sector-wideThe week tracked a sharp sector re-rating. The benchmark returned +1.84% and the three peers +4.63%, +16.79% and +19.72%, against +11.22% for the shares - a return below the peer average. Civmec's 1H FY2026 results had been released before the week opened, on the morning of 13 February 2026, a session on which the shares closed 0.3% higher. Monadelphous +4.6 · NRW +16.8 · SCEE +19.7
2329 Apr 2026+5.3%−0.3%−0.5%+5.8%ResidualNo announced cause identified. Civmec lodged no announcement between 13 February and 15 May 2026. The benchmark returned -0.27% and the peer set +0.55% over the same session, and turnover was 5.73x the trailing median. Monadelphous −0.6 · NRW −0.5 · SCEE +2.8
2415 May 2026+6.5%−0.1%+0.5%+6.0%ResidualThe session coincided with the release of Civmec's Q3 FY26 business update, lodged with ASX at 8:18am AEST on 15 May 2026 and flagged price sensitive, which disclosed an order book of A$1.3 billion. The shares closed 6.5% higher on 4.02x the trailing median volume, against a benchmark return of -0.11% and a peer set return of +0.63%. Monadelphous +0.5 · NRW +1.9 · SCEE −0.5
2516 Jun 2026+5.0%+0.0%+0.3%+4.7%ResidualNo announced cause identified. Civmec lodged no announcement between 5 June and 7 August 2026. The benchmark returned +0.04% over the session; among the peers SXE rose 19.90% on its own new-works and equity-raising announcements, while MND fell 1.93% and NWH rose 0.28%. Turnover in Civmec was 20.08x the trailing median. The window high of A$1.995 was set the following session, on 17 June 2026. Monadelphous −1.9 · NRW +0.3 · SCEE +19.9
261 Jul 2026−5.6%−0.6%+0.4%−6.0%ResidualNo announced cause identified. Civmec lodged no announcement between 5 June and 7 August 2026. The benchmark returned -0.64% over the session and the peers +0.61%, +0.40% and -5.56%. Turnover was 6.26x the trailing median. The session was the first of the Australian financial year beginning 1 July 2026. Monadelphous +0.6 · NRW +0.4 · SCEE −5.6

Key developments: sources, timing and notes

What you can watch yourself

Every other test on this page waits for the company to file. These do not. Each row is a series you can look up yourself, free, today — with its latest recorded value and date, source, and limitations. Market-price context is not a company-specific operating trigger.

Trading Economics iron ore 62% Fe CFR Tianjin market reference, USD per tonne

Read the Iron Ore headline and the observation date in its summary, in USD per metric tonne. The publisher describes a CFD tracking a 62% Fe China-import CFR Tianjin reference; this is not an official SGX or CME settlement. Trading Economics (CFD-based market reference)

Last recorded
92.54 US$/t, 2026-11-10
Threshold status
No calibrated operating threshold; No verified historical comparison retained.
How often to look
weekly (the series prints daily)

What it points to. Iron ore prices provide context for resource clients' prospective capital spending. They do not establish whether a client will approve a project or award work to Civmec.

Direction only — this pack does not carry a coefficient from this series to reported earnings.

What it cannot tell you. Civmec is a contractor, not an iron ore producer. This quote does not measure client price decks, financing, project approvals, contract cancellations or conversion of the order book into cash. It is not a direct indicator for defence and infrastructure work. The 10 September 2026 correction withdraws the former watch/alert bands because their benchmark and client-capex calibration were not established; assess new awards and the next order-book disclosure instead.

Settled by the next quarterly order-book update, due 2026-11-30. Lead time: long and uneven: a capex decision reaches an award over quarters, and an award reaches revenue over years.

Notes and sources

Questions the filings do not answer

How large was the FY2025 Boorloo Bridge recognition release? Management names the cause and never sizes it. Without it, the FY2025 earnings base cannot be put on a comparable footing with FY2024 or FY2026.
How much of the order book converts within twelve months? One statement exists, from FY2020, and it is qualitative (“over half”). No conversion profile has been published since, and the definitional basis has changed at least twice.
What are the exact facility maturities, covenant definitions and available cash? Public filings state that covenants are met and disclose gross limits and utilisation, but not a complete maturity ladder, numerical covenant headroom, minimum operating cash or all draw and security conditions.
What is the fixed-versus-variable split of the Henderson cost base? Resources revenue fell 26.8% in FY2025 and its gross profit fell 49.4%. How much of that gearing is structural is not derivable from the disclosure.
What does steel now cost Civmec, as a share of the job? The 2012 prospectus disclosed steel at 23.8%, 20.0% and 28.6% of total cost of sales in FP2010, FY2011 and 1Q2012, with concrete a further 1–6% and labour about 32%. The issuer stopped disclosing this after listing. For a fixed-price contractor that is a material input exposure which can no longer be tracked from the accounts, and it is a candidate partial explanation for margin movements the commentary attributes to activity levels alone.
What is Civmec’s disclosed role in SEA3000? The company now owns the OPV prime contractor. Australia’s general-purpose frigate programme is the obvious adjacency, and the filings say nothing about it.
On what pattern will the A$22.195m acquired contract liability be released? The interim statements said straight-line over four years from acquisition. The FY2026 accounts recognise none of it, leave the carrying amount unchanged, and say management “will continue to assess the appropriate timing and pattern of release as the contract progresses”. No basis, trigger or expected profile is given. This is a known future non-cash credit of A$22.195m whose timing is now entirely undisclosed, against FY2026 profit to owners of A$52.1m.
How much of the A$514.9m receivable and contract-asset book is the Commonwealth pass-through, at 30 June 2026? A$128.315m of receivables and the identical amount of payables came in with the acquisition, and A$92.8m of the payable was still outstanding at 31 December 2025. The FY2026 accounts disclose A$125.278m receivable from the Commonwealth and A$81.371m payable to NVL at 30 June 2026; their A$43.907m difference is a balance-sheet difference, not by itself a cash loss or an explanation of operating cash flow. Without it the working-capital movement cannot be split between pass-through gross-up and genuine trading absorption, and that split is the whole question raised by a negative operating cash flow.
How is “net tangible asset backing per ordinary security” computed? Item 9 of the Appendix 4E gives 135.42 cents at 30 June 2026 and 121.52 cents at 30 June 2025. Both exceed net asset value per share on the same dates — 116.06 and 104.37 cents — which a tangible-assets measure struck off the same equity cannot do. The figure appears to add back deferred tax, but the issuer publishes no definition and it does not reconcile to the balance sheet. It is recorded here as disclosed and is not used anywhere on this page.
Why is the order book measured at 31 July? Neither the FY2025 nor the FY2026 result publishes a 30 June order book; both give a figure a month later. The comparison the reader most wants — closing book against closing balance sheet — is therefore not available in either year, and the A$1.4bn at 31 July 2026 is A$100m below the A$1.5bn stated on 4 June 2026 without the movement being explained.

Download

A print-ready PDF of this page, for reading away from the screen: Civmec evidence library (PDF). It carries the same content as this page — as-filed history, segment economics, the order book, the balance sheet, cash conversion, the credit view and open questions.

Sources and corrections

This page is built from Civmec’s own filings: fifteen annual reports covering FY2012 to FY2026 (complete since listing), the full-year and half-year results announcements from FY2012 to FY2026, the 1H FY2026 Appendix 4D and media release of 12 February 2026, the Q3 FY2026 business update of 15 May 2026, the order-book announcement of 4 June 2026, the Luerssen Australia acquisition announcements of 26 June and 1 July 2025, and the complete FY2026 results set dated 27 August by the issuer and lodged on the ASX tape at 07:45 AEST on 28 August 2026 — Appendix 4E, condensed statements for the six months and full year, audited report of the directors and financial statements, media release, investor presentation and notice of record date.

Retrieval notes. The FY2013 annual report is served as a zero-byte file by the issuer’s own website; it was recovered from the Internet Archive instead. The 2012 IPO prospectus was also recovered from the Internet Archive (359 pages) after an earlier attempt failed against an archive.org outage; its disclosures are used in the concentration and input-cost sections above.

A separate revision and methodology note records in full how this page was built, every error found in the first two versions, how each was found, and what was corrected. It contains no investment opinion.

Update and corrections, 28 August 2026 — the FY2026 result. Civmec’s issuer documents are dated 27 August 2026; the official ASX tape lodged them at 07:45 AEST on 28 August. This page was refreshed against the complete primary package. Every table, chart and ratio above now carries FY2026; the information cutoff moved from 20 August to the 28 August ASX lodgement. Three published statements changed, and all three are recorded rather than quietly overwritten:

  • The acquired contract liability was not released. The interim statements’ stated four-year straight-line policy was not applied in FY2026. The derived A$5.5m annual credit, and the A$2.8m restatement of the 1H FY2026 gross margin published here on 18 August, are both withdrawn. Set out in full in the acquisition section above.
  • The freehold revaluation excess is restated on the note’s own basis. The 30 June 2025 excess over historical cost was published here as A$254.9m and 55.3% of the class. That could not be reproduced from the note’s two columns; both years are now given on the FY2026 note’s basis — A$252.8m and 55.7% at 30 June 2026, A$208.1m and 50.3% at 30 June 2025.
  • The facility description was out of date. This page still described an A$86m corporate-loan limit stepping down A$2m a quarter alongside a separate A$70m multi-option facility. Those were consolidated during FY2026 into one A$160m revolving multi-option limit with no step-down, which the 1H FY2026 statements had already disclosed. Corrected in the funding section.

Two things this page said before the result, and which the result confirmed, are left standing with their original dates so they can be scored: that the FY2025 Resources margin of 7.6% was “a trough, not a new level” (it came in at 11.5%), and that the Infrastructure, Marine & Defence segment’s underlying margin was near 11.6% against the 34.5% FY2025 print (it came in at 11.0%). One neutral credit watchpoint — negative operating cash flow alongside rising contract assets or receivables — triggered, and is recorded as triggered in the credit section.

The 90-second video summary above predates the result and has not been re-recorded. The price-and-developments section below carries filings to 4 June 2026 and does not yet include the FY2026 package lodged on 28 August 2026.

Corrections made after publication. This page was first published on 17 August 2026 and revised on 18 August 2026 following an independent blind review of the underlying pack, which returned 37 findings including six of the highest severity. Each was verified against the primary filing before correction. The material changes to this page were: the order-book trough (published as A$760m at 31 March 2025, corrected to A$633m at 31 December 2024, and the increase from 97% to 137%); the EBITDA basis (the profit-and-loss finance-cost line excluded lease interest booked in cost of sales, understating FY2025 EBITDA by A$3.8m and overstating interest cover); a statement that the Luerssen purchase-price allocation had not been disclosed, when it had been on 12 February 2026; and the FY2018 implied exchange rate. The 1H FY2026 segment note and the acquisition note were added, having been overlooked in the first build.

Second round of corrections, 18 August 2026. A further independent review — this one guided rather than blind, meaning the reviewer was pointed at the areas the author believed weakest — returned sixteen findings, two of the highest severity. Both were re-derived from the primary filing before acceptance and both held. The changes affecting this page were:

Two of these — the facility description and the board-turnover framing — had been published on this page and were read by anyone who visited before 18 August 2026. Neither reviewer is independent of the author’s model family, which is a real limitation on how much assurance these passes provide, and is stated rather than argued away.

Corrections made during the build. Five transcription errors were caught by arithmetic identity checks before publication and corrected against the filings: a missing share-of-joint-venture line in FY2018, a missing other-expenses line in FY2019, a missing other-credits line in FY2023, an income-tax-receivable balance attributed to the wrong year across FY2024/FY2025, and a wrong non-controlling-interest balance in FY2022. Each was re-derived from the filing’s own subtotals. They are listed with their evidence in the working pack.

This page is an evidence library with independent public credit analysis. It contains Figures labelled derived are computed from reported figures with the computation stated.

Reader questions & corrections

Ask about this company, challenge a source or suggest a factual correction. Only selected questions that SMID Research has reviewed and answered are published.

No reader questions have been published yet.

Submit a private question or correction

Submissions are private by default. Your email is encrypted and never published. Please do not send confidential or inside information, allegations about individuals, promotions, or requests for personalised investment advice.

Connecting the secure submission form…

Secure-form fallback. Email your question or correction. Include the company name and disclose any position or relationship. Do not send confidential or inside information.

9 September 2026 corrections

These bounded retrospective corrections clarify specific published facts or calculations. They retain each report's existing research cutoff and do not represent a full refresh or a finding that all possible issues are resolved.

Civmec Limited

  • Verified Fact. FY2026 disclosures identify an A$125.278m Commonwealth receivable and A$81.371m payable to NVL at 30 June 2026, and a facility expiry of 31 January 2028 subject to possible bank extension. Source basis: FY2026 audited filing notes 11, 20 and 21. Limitation: The balance difference does not by itself establish a cash loss or covenant headroom.
Chart notes and sources
  1. Original SMID Research comic. AI-assisted, monochrome artwork depicts the reported operating steps of Civmec Limited; captions and dated mix figures state the economics using issuer disclosures available to 2026-08-28. The drawings are representative—not issuer artwork, an exact product or site design, a statement of scale, or a company forecast.
  2. Revenue peaked at A$1,033m in FY2024 before falling 21.6% in FY2025; profit to owners fell 34.0%. Pre-FY2019 years use a different currency and framework and are excluded.
  3. Group margins recovered from the FY2019 trough and stayed within a narrow band from FY2021, despite the segment shifts below.
  4. Resources supplied 78%–85% of revenue for five years; its FY2025 share fell through contraction, not diversification.
  5. FY2025 group gross margin held at FY2024’s 11.5%, masking Resources’ loss of 341 basis points and Infrastructure, Marine & Defence’s 34.5% against an 11–14% history.
  6. FY2025: 39% of group gross profit on 13% of revenue. Undisclosed segment assets force this chart to use revenue share as a weaker capital proxy.
  7. The order book troughed at A$633m at 31 December 2024, peaked at a record A$1.5bn on 4 June 2026, and was stated at A$1.4bn at 31 July 2026 with the FY2026 result — still 121% above the trough, and A$100m below the June peak. Part of the increase was acquired rather than won: the remaining SEA1180 programme entered the book with the Luerssen acquisition in July 2025. “In excess of” statements are plotted at the stated floor.
  8. 2H FY2026 is the largest half Civmec has reported, at A$522.5m — 69.8% above the A$307.7m trough half of 2H FY2025 and 37.4% above 1H FY2026. The year is heavily back-loaded: 57.9% of FY2026 revenue and 58.8% of its profit fell in the second half. Second halves and 1H FY2026 are reported; other first halves are derived as the full year less the reported second half.
  9. The revaluation reserve rose from nil before FY2020 to A$228.5m of A$591.2m equity at 30 June 2026: 38.7% versus 35.8% a year earlier. FY2026’s A$54.8m gross gain bypassed profit; associated deferred tax liability was A$104.1m.
  10. FY2026 return on average equity was 9.3% reported, 14.8% excluding the reserve (FY2025: 8.4%, 12.7%). Reserve growth widens the gap, including in FY2026.
  11. FY2026 statutory operating cash flow was negative A$23.1m against A$52.1m profit: the Australian-dollar era’s first outflow, an A$84.0m swing from FY2025. FY2022 operating cash flow of A$1.8m against A$50.8m profit came close to an outflow, showing why single-year conversion says little here; two of the last five years demonstrate it.
  12. Click a quarter — on the chart or in the return strip under it — to read its filings beside its large moves.
  13. Every threshold-detected move in the window with its market and sector controls, dispositioned in the price-driver register; rows with a written note carry a numbered pin on the chart.